Laserfiche WebLink
Total acres <br />Total acres , <br />Total acres <br />Total acres <br />a <br />. <br />backfilled: <br />seeded w/ <br />6 <br />w/topsoil <br />/ <br />mulched w/ <br />. <br />approved mix: <br />replaced: <br />S� <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />, <br />Mulch application <br />a. --5 „ <br />graded: <br />2, . <br />fertilized w/ <br />/ <br />replacement <br />6 <br />rate (tons): <br />P =r <br />apvd fertilizer: <br />depth (in.): <br />A cre, <br />Seed <br />0raa., 0-a r-t <br />Fertilizer <br />1 - c , ,I, a-} <br />Mulch <br />- ‘l o w r1 <br />application <br />method: <br />Hy � 1 r ° <br />application <br />method: <br />1-t l dr. <br />application <br />method: <br />4 <br />r- I M, /pe +�_, <br />Permit #: M- pi ? C - 0d. <br />Annual Report <br />According to C.R.S. 34 -32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall <br />submit the annual fee, an annual report and map showing the extent of current disturbances to affected land, <br />required monitoring information, reclamation accomplished to date and during the preceding year, any new <br />disturbance that is anticipated to occur during the upcoming year, any reclamation that will be performed during <br />the upcoming year the dates for the beginning of active operations, and the date active operations ceased for the <br />year, if any. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules <br />and the act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1) <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2) <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES <br />If "YES," please note time limits related to completion of reclamation, Rule 313. <br />4. What was the date of last excavation, processing or hauling activity at the mine? S t '� 2.0 1 1 <br />YES NO <br />NO <br />LESS <br />5. Does the mine operate more or less than 180 days per year? <br />[MESS”, please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES Vc <br />b) approval for INTERMITTENT OPERATION? YES NO <br />7. Number of acres currently affected (mining + Incomplete and or unreleased reclamation) .5--S- <br />8. Number of acres that were newly affected during the current report year. 0 <br />9. Number of acres that were reclaimed during the current report year, <br />10. Estimated new acreage to be affected in the next report year. 0 <br />11, Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />