Laserfiche WebLink
Permittee Contact: <br />i� ' <br />t` (41 -1Ef VALpLZ <br />Permittee Company: <br />0.2V 11 L —A (lot, 4v' -c, <br />� <br />Address: <br />R. 0. a- v 1 3 0 <br />5 Al- 1.-Gtis CAO F ( 5 <br />Phone Number: <br />Fax Number: <br />itt - (oYa - - 3003 <br />Email Address: <br />13. Attach a map to this report that accurately depicts the permit boundary, current affected area boundary and <br />location of the acreages specified in items 7- 12 and 14. Please check the appropriate response below: <br />UPDATED MAP ATTACHED: CONDITIONS UNCHAGED - PREVIOUS MAP ACCURATE. <br />14. Is weed control being conducted in accordance with an approved Weed Control Plan? YES N/A <br />If "YES ", indicate the weed species, control area, control type, application rate and treatment date on the <br />report map. <br />15. Is adequate topsoil reserved for reclamation, based on your approved permit? YES NO QUA) <br />If "NO ", please explain: <br />16. Is the reserved topsoil vegetated /stabilized in accordance with Rule 3.1.9(1)? YES NO <br />If "NO" please explain: <br />17. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the <br />State Engineer (Well Permit, S.W.S.P., and /or Permanent Augmentation Plan)? YES NO N/A <br />18. Are all hazardous materials stored within approved spill containment structures? YES NO W <br />19. Is your financial warranty value sufficient to cover the cost to complete reclamation? YES NO <br />20. Is your basis for legal right to enter is still valid? <br />Please provide current contact information: <br />Signature of Corporate Officer, Owner, Documented Designee <br />117 /1Z. <br />Date <br />ES NO <br />21. Does your permit require you to submit monitoring information annually? YES NO <br />If "Yes ", please attach the required monitoring results to this annual report. <br />I, the undersigned, hereby state that the information provided in this report is true and accurate, and that site <br />operations are being conducted in accordance with the Division approved mining and reclamation plans. <br />