Laserfiche WebLink
Total acres <br />Total acres <br />, <br />Total acres <br />Total acres <br />backfilled: <br />rv/q <br />seeded w/ <br />�� <br />w /topsoil <br />/V / <br />'/ <br />mulched w/ <br />NA <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />/5 <br />fertilized w/ <br />/ <br />r /'/ <br />'LI /� <br />replacement <br />p <br />/1/ <br />(tons : <br />rate ) <br />apvd fertilizer: <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />A/41 <br />application <br />N// <br />/l/ /q <br />method: <br />method: <br />a pplication <br />/ <br />method: <br />Annual Report <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall <br />submit the annual fee, an annual report and map showing the extent of current disturbances to affected land, <br />required monitoring information, reclamation accomplished to date and during the preceding year, any new <br />disturbance that is anticipated to occur during the upcoming year, any reclamation that will be performed during <br />the upcoming year, the dates for the beginning of active operations, and the date active operations ceased for the <br />year, if any. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules <br />and the act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1) <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2) <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES co <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? 9 - /- 201/ <br />5. Does the mine operate more or less than 180 days per year? <br />If "LESS ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) 9- <br />8. Number of acres that were newly affected during the current report year. 5 <br />9 Numb ref ( S.that reclaimed-during, the current report year. / 5 <br />10. Estimated new acreage to be affected in the next report year. 0 <br />11. Estimated acres to be reclaimed in the next report year. 0 <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />YES <br />YES <br />NO <br />NO <br />LESS <br />