Laserfiche WebLink
MINE ENGINEERING CIVIL ENGINEERING <br />MINE RECLAMATION CONST. MANAGEMENT <br />February 2, 2012 <br />Janet Binns <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Lorencito Canyon Mine, Permit C- 1996 -084 <br />2011 Annual Reclamation Report <br />Dear Ms. Binns: <br />On behalf of New Elk Coal Company (NECC), enclosed is its 2011 annual reclamation report for <br />the Lorencito Canyon Mine. NECC performed weed control and minor erosion repairs at the <br />mine during 2011. Re- seeding was performed at the pond cleanings area ( -2 acres), the fill 6 <br />area ( -1 acre) and various other areas for a total of about 3.5 acres. On the following page there <br />is a picture of the pond cleanings disposal area that was included in the DRMS' September 2, <br />2011 inspection report. A copy of a seed tag is also provided on the following page. <br />Sincerely, <br />Stover, P.E. <br />Consulting Engineer <br />cc: Ron Thompson, NECC <br />Mike Trujillo, CDOW <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7 STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />Attachments: (3) 2011 Annual Reclamation Report <br />RECEIVED <br />FEB 06�: <br />Division of Ret,.a. ;,, -• <br />Mining 8 Safety <br />