Laserfiche WebLink
Site Location and Notable Features 1 <br />Mapping 3 <br />Hydraulic Modeling 3 <br />Proposed Conditions 4 <br />Potential for Overtopping and Erosion 4 <br />Tract C 6 <br />Tract D 7 <br />Recommended Action 7 <br />Tract C- 7 <br />Tract D- 7 <br />References 8 <br />Tables <br />Table 1, Existing Conditions USACE Model. WSEL= Water Surface Elevation, ROB= Right overbank, MC= <br />Main Channel 5 <br />Table 2, Anderson Consulting CLOMR models 5 <br />Contents <br />Figures <br />Figure 1- View looking south across site showing existing vegetation and topography 1 <br />Figure 2- Typical surface material at the site is silty clay with sand, underlain by clay and gravels (note <br />pen for scale) 2 <br />Figure 3- View of Cache la Poudre river through site (downstream of drop structure) showing existing <br />man made and vegetative bank stabilization 2 <br />Figure 4- View of drop structure looking north towards diversion take out. The drop structure has an <br />approximate elevation change of 9ft 3 <br />iiiPage <br />