Laserfiche WebLink
Hayden Gulch Terminal LLC <br />Hayden Gulch Loadout <br />SL -1 - Phase I Bond Release Request <br />The following is a summary of the Phase I demolition activities that have been <br />HGT has removed all structures associated with the coal loadout, including: <br />— Truck Dump Hopper <br />— Dump Hopper Conveyor Tunnel <br />— Dump Hopper Conveyor <br />— Crusher Building <br />— Stacker Tube <br />— Stacker Conveyor <br />— Powerhouses (2) <br />— Dust Suppression Pressure Tank Building <br />— Dust Suppression System Building <br />— Water Storage Tank <br />— Loadout Building <br />— Loadout Belt <br />— Haul Roads and Access Roads <br />The bonded "Unloading" facilities that were never constructed include: <br />— Railcar Positioner and Hopper <br />— Railcar Dump Hopper Belt Tunnel <br />— Dump Hopper Conveyor Tunnel <br />— Dump Hopper Conveyor (60 ") <br />— Radial Stacker pad <br />— Radial Stacker Boom <br />— System Control Building <br />January 2012 <br />completed. <br />The coal fines associated with the coal stockpile pad and the coal storage pad were placed next to <br />the toe of northern slope around the area and covered with a minimum of four (4) feet of <br />nontoxic, noncombustible material. <br />The perimeter drainage channels constructed to control runoff and erosion during operations <br />were left inplace. These channels were designed and constructed to control at least the 10 -year, <br />24 -hour storm event. Ditch 3A was moved slightly to the west to contain the runoff from the <br />reclaimed area between SAE 2 and Ditch 3, as shown Exhibit B, Postmine Topography. <br />RECLAMATION BOND AMOUNT REQUESTED FOR RELEASE <br />Based on the above discussion of the areas within this SL -1 Phase I Bond Release Request, HGL <br />is asking for the release of $488,408. Attachment D, Bond Release Calculation, contains the <br />rational and calculation for monies requested for release. <br />ATTACHMENT DESCRIPTIONS <br />• Attachment A, Notarized Statement - contains a Notarized Statement stating that all <br />reclamation work has been completed in compliance with approved permit and Rule <br />3.03.2(1)(e). <br />• Attachment B, Public Notification Letters - contains copies of the "Notification" letters <br />sent to the entities listed in Section VI. <br />SL -1 -4 <br />