My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-19_REVISION - M1980080
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980080
>
2012-01-19_REVISION - M1980080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:53 PM
Creation date
2/2/2012 7:39:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980080
IBM Index Class Name
REVISION
Doc Date
1/19/2012
Doc Name
TR Submittal
From
Grand Junction Concrete Pipe Company
To
DRMS
Type & Sequence
TR3
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Grand Junction Concrete Pipe Company <br />2311 River Road • P.O. Box 1849 • Grand Junction, Colorado 81502 • 970/245 -9301 • FAX 970/243 -6703 <br />Mr. Dustin Czapla <br />Division of Reclamation, Mining and Safety <br />101 South 3rd Street, Room 301 <br />Grand Junction, CO 81501 <br />Dear Mr. Czapla: <br />IDG /pry <br />Enclosure <br />AN EQUAL OPPORTUNITY EMPLOYER <br />January 17, 2012 <br />Re: Una Pit, Permit No. M- 1980 -080, Technical Revision No. 3 <br />Enclosed please find two copies of a revised Reclamation Plan for Technical Revision No. 3 for <br />the above referenced permit. The plan shows the location of four ponds, which will be the final <br />configuration of the pit when mining has been completed. The original pond was constructed <br />in the early eighties. <br />The construction of the two ponds on the west side of the property started in 2005. These <br />ponds are covered by a Substitute Water Supply Plan issued February 5, 2004. <br />The future pond on the east side of the permit will have a surface area of 62 acres and is being <br />constructed under a Substitute Water Supply Plan issued March 19, 2008. The remaining area <br />to be mined contains approximately 18 acres and is located east of the gas well along the north <br />side of the pit. Mining will be completed in this area in approximately three years. <br />Enclosed is a check in the amount of $216.00 for the technical revision fee. <br />Sincerely, <br />L <br />Ivan Geer, PE <br />RECEIVED <br />JAN 19 2012 <br />GRAND JUNCTION FIELD OFFICE <br />RECLAMATION MINING &SAFETY <br />S.b <br />
The URL can be used to link to this page
Your browser does not support the video tag.