Laserfiche WebLink
STATEMENT BY OPERATOR <br />I, Jerald Schnabel, state that the slurry wall lining portion of the Reclamation Plan for <br />M- 1986 -015, Pueblo East Pit, has been satisfied in accordance with the Construction <br />Materials rules of the Division of Reclamation, Mining, & Safety and the Guidelines for <br />Lining Criteria for Gravel Pits of the Division of Water Resources. <br />Signed: <br />Je a d Schnabel <br />Pr ident — Transit Mix of Pueblo <br />Subsidiary of Continental Materials Corporation <br />Date: January 05 2012 <br />