My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-26_PERMIT FILE - P2011033
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011033
>
2012-01-26_PERMIT FILE - P2011033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:48:00 PM
Creation date
2/2/2012 7:38:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011033
IBM Index Class Name
PERMIT FILE
Doc Date
1/26/2012
Doc Name
Amendment to Application and Additional Issues for Clarification.
From
DRMS
To
Thomas Cavanaugh- AMEC
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loader Worksheet Cont'd Task # 03A Page 2 of 2 <br />Load Bucket Capacity <br />Rated Capacity: 1.50 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other - rock/dirt mixtures (100 -120 %) 1.100 <br />Adjusted Capacity: 1.65 LCY <br />Job Condition Correction Factors <br />Site Altitude: 6500 feet <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />1.00 <br />0.83 <br />0.83 <br />Source <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />Total Travel Time: 0.0635 minutes <br />Total Cycle Time: 0.5985 minutes <br />Unadjusted Hourly Unit Production: 165.42 LCY/Hour <br />Adjusted Hourly Unit Production: 137.30 LCY/Hour <br />Adjusted Hourly Fleet Production: 137.30 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: 2.43 Hours <br />Unit cost: $0.572 /LCY Total job cost: $191.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.