Laserfiche WebLink
been constructed, but not included in the initial TR -60 application. <br />The permittee /operator circumvented the permitting process by constructing structures prior to <br />submitting a plan and prior to obtaining permit approval. This represents intentional conduct <br />and a penalty of $1,250.00 is proposed. <br />D. Good Faith <br />Four of the five abatement steps were abated by January 11, 2012. The abatement deadline for <br />the last step has been extended until February 10, 2012. Since the violation has not been fully <br />abated and terminated, a good faith reduction is not proposed. <br />Total Proposed Civil Penalty $2550.00 <br />