Laserfiche WebLink
GWS -51 <br />08/2008 Please type or print legibly in black or blue ink <br />( dV lo4,0 / ,v/,vv <br />%24 /2/ 1//c o€' (0 c n o <br /><t! 7`- /j / "//�ti Co, <br />Well Owner's Name, Address & Phone <br />Landowner's Name <br />Please check one and complete as indicated including contact info. <br />❑ Water Well Driller Licensed in Colorado — Lic. No. <br />❑ Professional Engineer Registered in Colorado — Reg. No <br />❑ Professional Geologist per CRS 34 -1- 201(3) <br />Zster professional - anyone directly employed by or under the supervision of a licensed driller, <br />egistered professional en ineer or professional geolggist <br />Contact / Company en <br />u✓� <br />Address / i a/ 42, <br />City, State & Zip V /G i7 (O <br />Phone 7/9- Gp D P- ,*/09f Fax <br />Print Name: <br />Signature: <br />Div. WD <br />NOTICE OF INTENT TO CONSTRUCT MONITORING HOLE(S) <br />v ,e'Aif -(4 <br />COLORADO DIVISION OF WATER RESOURCES -1313 SHERMAN ST -RM 8 21 - DENVER -00-80203 <br />PHONE. 303 - 866 - 3581 -- -FAX: 303 - 866 -3589 <br />Cott l��o�a/��✓/ �o� <br />7/9 - 66 4 °Y- 3 -Lc,' <br />7V0/•// <br />(04 <br />ACKNOWLEDGEMENT FROM STATE ENGINEER'S OFFICE <br />FOR OFFICE USE ONLY <br />MH PROCESSED BY <br />BAS MD DATE ACKNOWLEDGED <br />CONDITIONS OF MONITORING HOLE ACKNOWLEDGEMENT <br />Location: ° 6 '/ .6 Y,, Section / 7 <br />Township /,- ❑N E2S, Range ❑EJ$W, e <br />County l 2 L.e <br />Subdivision, Lot, Blk, Flg (as applicable) <br />Site /Property Address /611-c,Q /07O <br />GPS Location in UTM format (optional): <br />Set GPS unit to true north, datum NAD83, and use meters for <br />the distance units, ❑Zone 12 or ❑Zone 13 <br />Easting Northing <br />1 <br /># of Monitoring Hole(s) to be constructed: <br />Estimated Depth 7S ?t., Aquifer <br />Purpose of Monitoring Hole(s) T g ' l,P 4./ re-10 <br />TR.4 v _f .ov c,m /79,v /: vei..s4; I (? <br />Anticipated Date of Construction: //— /- 0 <br />Date Notice Submitted: // — 0d -/t) <br />(Must be at least 3 days prior to construction) <br />A COPY OF THE WRITTEN NOTICE OR ACKNOWLEDGEMENT SHALL BE AVAILABLE AT THE DRILLING SITE. <br />1) Notice was provided to the State Engineer at least 3 days prior to construction of monitoring & observation hole(s). <br />2) Construction of the hole(s) must be completed within 90 days of the date notice was given to the State Engineer. Testing and /or <br />pumping shall not exceed a total of 200 hours unless prior written approval is obtained from the State Engineer. Water diverted during testing <br />shall not be used for beneficial purposes. The owner of the hole(s) is responsible for obtaining permit(s) and complying with all rules and <br />regulations pertaining to the discharge of fluids produced during testing. <br />3) All work must comply with the Water Well Construction Rules, 2 CCR 402 -2. Minimum construction standards must be met or a vanance <br />obtained. Standard permit application and work report forms are found on the DWR website at http : / /www.water.state.co.us. Well <br />Construction and Test Reports (GWS -31) must be completed for each hole drilled. The licensed contractor or authorized individual must <br />submit the completed forms to this office within 60 days of monitoring hole completion. <br />4) Unless a well permit is obtained, the hole(s) must be plugged and sealed within one (1) year after construction. An Abandonment <br />Report (form GWS -9) must be submitted within 60 days of plugging & sealing. The above MH acknowledgement number, owner's <br />structure name, and owners name and address must be provided on all well permit application(s), well construction and abandonment reports. <br />5) The owner of the hole(s) shalt maintain records of water quality testing and submit this data to the State Engineer upon request. <br />6) A MONITORING HOLE CANNOT BE CONVERTED TO A PRODUCTION WATER WELL, except for purposes of remediation (recovery) <br />or as a permanent dewatering system, if constructed in accordance with the Water Well Construction Rules and policies of the State <br />Engineer. <br />7) IF HOLES WILL NOT BE CONSTRUCTED UNDER THIS NOTICE WITHIN 90 DAYS, PLEASE WRITE, NO HOLES CONSTRUCTED" ON A <br />COPY OF THE ACKNOWLEDGED NOTICE WITH THE FILE NUMBER AND FAX THE COPY TO THE DIVISION OF WATER RESOURCES, <br />THIS ACKNOWLEDGEMENT OF NOTICE DOES NOT INDICATE THAT WELL PERMIT(S) CAN BE APPROVED. <br />(Use above space for labels or additional conditions as needed) <br />