Laserfiche WebLink
• <br />GWS -51 <br />08/2008 <br />NOTICE OF INTENT TO CONSTRUCT MONITORING HOLE(S) <br />Please type or print legibly in black or blue ink Q- /7 <br />COLORADO DIVISION OF WATER RESOURCES -1313 SHERMAN ST -RM 821- DENVER -CO -80203 <br />PHONE: 303- 866 - 3581 —FAX: 303- 866 -3589 <br />Well Owner's Name, Address & Phone C, C V/61-0/2j,y/ C <br />A0, l2o,c /9'/ V 6 17 12 /g Cp c'oi6O <br />Landowner's Name CG y �q,� //jr✓J�✓� (� <br />Please check one and complete as indicated including contact info: <br />❑ Water Well Driller Licensed in Colorado - Lic. No. <br />❑ Professional Engineer Registered in Colorado - Reg. No. <br />❑ Professional Geologist per CRS 34 -1- 201(3) <br />P Other - anyone directly employed by or under the supervision of a licensed driller, <br />egistered professional engineer or professi nal geologist <br />Contact / Company /1,411/k (/AI/O,t/' /C 44 V, <br />Address /4 o r 40.19 /9/ <br />City, State & Zip t � / � Co ?ono q <br />Phone 7l9- 6� fDY� t ;d'/ "/ - Fax 7 /9" 3 s,V <br />Signature: <br />Print Name: /1/0 n// <br />ACKNOWLEDGEMENT FROM STATE ENGINEER'S OFFICE <br />FOR OFFICE USE ONLY <br />MH PROCESSED BY <br />��t�/� <br />Location: / / r� Y. /✓>✓ Y, Section "� / <br />Township / ❑N [Range 61 ❑E 9 i, P <br />g t9 <br />County � - L <br />Subdivision, Lot, Blk, Flg (as applicable) <br />N <br />Site /Property Address re -4 4-1, 10 2 62 (41/77 /Qa,Q e? <br />GPS Location in UTM format (optional): <br />Set GPS unit to true north, datum NAD83, and use meters for <br />the distance units, ❑Zone 12 or ❑Zone 13. <br />Easting Northing <br /># of Monitoring Hole(s) to be constructed: <br />Estimated Depth /OO Ft., Aquifer <br />Purpose of Monitoring Hole(s) L✓417p <br />/7ON/ TD,Q /At <br />Anticipated Date of Construction: CV /4 <br />Date Notice Submitted: / � / d' // <br />(Must be at least 3 days prior to construction) <br />Dlv. WD BAS MD DATE ACKNOWLEDGED <br />CONDITIONS OF MONITORING HOLE ACKNOWLEDGEMENT <br />A COPY OF THE WRITTEN NOTICE OR ACKNOWLEDGEMENT SHALL BE AVAILABLE AT THE DRILLING SITE. <br />1) Notice was provided to the State Engineer at least 3 days prior to construction of monitoring & observation hole(s). <br />2) Construction of the hole(s) must be completed within 90 days of the date notice was given to the State Engineer. Testing and /or <br />pumping shall not exceed a total of 200 hours unless prior written approval is obtained from the State Engineer. Water diverted during testing <br />shall not be used for beneficial purposes. The owner of the hole(s) is responsible for obtaining permit(s) and complying with all rules and <br />regulations pertaining to the discharge of fluids produced during testing. <br />3) All work must comply with the Water Well Construction Rules, 2 CCR 402 -2. Minimum construction standards must be met or a variance <br />obtained. Standard permit application and work report forms are found on the DWR website at httu : / /www.water.state.co.us. Well <br />Construction and Test Reports (GWS -31) must be completed for each hole drilled. The licensed contractor or authorized individual must <br />submit the completed forms to this office within 60 days of monitoring hole completion. <br />4) Unless a well permit is obtained, the hole(s) must be plugged and sealed within one (1) year after construction. An Abandonment <br />Report (form GWS -9) must be submitted within 60 days of plugging & sealing. The above MH acknowledgement number, owner's <br />structure name, and owner's name and address must be provided on all well permit application(s), well construction and abandonment reports. <br />5) The owner of the hole(s) shall maintain records of water quality testing and submit this data to the State Engineer upon request. <br />6) A MONITORING HOLE CANNOT BE CONVERTED TO A PRODUCTION WATER WELL, except for purposes of remedlation (recovery) <br />or as a permanent dewatering system, if constructed In accordance with the Water Well Construction Rules and policies of the State <br />Engineer. <br />7) IF HOLES WILL NOT BE CONSTRUCTED UNDER THIS NOTICE WITHIN 90 DAYS, PLEASE WRITE, "NO HOLES CONSTRUCTED" ON A <br />COPY OF THE ACKNOWLEDGED NOTICE WITH THE FILE NUMBER AND FAX THE COPY TO THE DIVISION OF WATER RESOURCES. <br />THIS ACKNOWLEDGEMENT OF NOTICE DOES NOT INDICATE THAT WELL PERMIT(S) CAN BE APPROVED. <br />(Use above space for labels or additional conditions as needed) <br />