Laserfiche WebLink
Signature: <br />DIV. WD <br />NOTICE OF INTENT TO CONSTRUCT MONITORING HOLE(S) <br />COLORADO DIVISION OF WATER RESOURCES -1313 SHERMAN ST -RM 821 - DENVER -00-80203 <br />PHONE 303 - 866 - 3581 -- -FAX• 303 - 866 -3589 <br />GWS -51 <br />08/2008 Please type or print legibly in black or blue ink <br />Well Owner's Name, Address & Phone CC /74/L p 4A//Aft ( O <br />?ok /9 V/ 7 CO P ©d 7 <br />Landowner's Name CC v V 2i /7//✓ /j,/4. ro <br />Please check one and complete as indicated including contact info: <br />❑ Water Wet Dnller Licensed in Colorado - Lic No. <br />❑ Professional Engineer Registered in Colorado - Reg. No. <br />❑ Professional Geologist per CRS 34 -1- 201(3) <br />S T Other - anyone directly employed by or under the supervision of a licensed driller, <br />registered professional en sneer or profe sional geologis <br />Contact / Company /j R/ VA �✓/ L dVGt �� / //v 6p <br />Address / / o. 4o)C // / <br />City, State & f/ <br />Zip / /GTU,[J /y CO 9-6-(0--2.2S-3/ <br />Q c�t7 O 0 <br />Q <br />Phone 7/7-r0 (5'7 0/1 Fax 7/ <br />Print Name: ///A ,€,k A70 /1 <br />ACKNOWLEDGEMENT FROM STATE ENGINEER'S OFFICE <br />FOR OFFICE USE ONLY <br />- MH PROCESSED BY <br />BAS MD DATE ACKNOWLEDGED <br />Location: 1 / / 1/ 1 4/ <br />%, Section 7 <br />Township /s❑N Range 6? ❑E1$(W, 6 <br />T <br />County / ESL - 7 <br />Subdivision, Lot, Blk, Flg (as applicable) <br />i <br />TEgz C /?® d2 <br />Site /Property Address <br />GPS Location in UTM format (optional): <br />Set GPS unit to true north, datum NAD83, and use meters for <br />the distance units, ❑Zone 12 or ❑Zone 13 <br />Easting Northing <br /># of Monitoring Hole(s) to be constructed: <br />Estimated Depth 7r0 Ft., Aquifer <br />Purpose of Monitoring � Hole(s) 7761 Be Ci Rt?t/T�, <br />72 4/0-CO +/L cR / 0 /v /TV.e, 4 11/62-4, <br />Anticipated Anticipated Date of Construction: <br />Date Notice Submitted: ft <br />(Must be at least 3 days pnor to construction) <br />CONDITIONS OF MONITORING HOLE ACKNOWLEDGEMENT <br />A COPY OF THE WRITTEN NOTICE OR ACKNOWLEDGEMENT SHALL BE AVAILABLE AT THE DRILLING SITE. <br />1) Notice was provided to the State Engineer at least 3 days prior to construction of monitoring & observation hole(s). <br />2) Construction of the hole(s) must be completed within 90 days of the date notice was given to the State Engineer. Testing and /or <br />pumping shall not exceed a total of 200 hours unless prior written approval is obtained from the State Engineer. Water diverted during testing <br />shall not be used for beneficial purposes. The owner of the hole(s) is responsible for obtaining permit(s) and complying with all rules and <br />regulations pertaining to the discharge of fluids produced during testing. <br />3) All work must comply with the Water Well Construction Rules, 2 CCR 402 -2. Minimum construction standards must be met or a variance <br />obtained. Standard permit application and work report forms are found on the DWR website at http: / /www.water.state.co.us. Well <br />Construction and Test Reports (GWS -31) must be completed for each hole drilled. The licensed contractor or authorized individual must <br />submit the completed forms to this office within 60 days of monitoring hole completion. <br />4) Unless a well permit is obtained, the hole(s) must be plugged and sealed within one (1) year after construction. An Abandonment <br />Report (form GWS -9) must be submitted within 60 days of plugging & sealing. The above MH acknowledgement number, owner's <br />structure name, and owner's name and address must be provided on all well permit application(s), well construction and abandonment reports. <br />5) The owner of the hole(s) shall maintain records of water quality testing and submit this data to the State Engineer upon request. <br />6) A MONITORING HOLE CANNOT BE CONVERTED TO A PRODUCTION WATER WELL, except for purposes of remediation (recovery) <br />or as a permanent dewatering system, if constructed in accordance with the Water Well Construction Rules and policies of the State <br />Engineer. <br />7) IF HOLES WILL NOT BE CONSTRUCTED UNDER THIS NOTICE WITHIN 90 DAYS, PLEASE WRITE, "NO HOLES CONSTRUCTED' ON A <br />COPY OF THE ACKNOWLEDGED NOTICE WITH THE FILE NUMBER AND FAX THE COPY TO THE DIVISION OF WATER RESOURCES. <br />THIS ACKNOWLEDGEMENT OF NOTICE DOES NOT INDICATE THAT WELL PERMIT(S) CAN BE APPROVED. <br />(Use above space for labels or additional conditions as needed) <br />