My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-20_HYDROLOGY - M1980244 (2)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1980244
>
2011-01-20_HYDROLOGY - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:12 PM
Creation date
1/30/2012 1:17:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
HYDROLOGY
Doc Date
1/20/2011
Doc Name
Notice of Intent to Construct Monitoring Wells.
From
CC&V
To
DWR
Permit Index Doc Type
Hydrology Report
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GWS -51 <br />08 /2008 Please type or print legibly in black or blue ink <br />Landowner's Name <br />O.4 - /9/ <br />City, State & Zip (_7V Ca <br />Phone 7/ Gd5 4'O5' <br />Address <br />Print Name: <br />Signature: <br />NOTICE OF INTENT TO CONSTRUCT MONITORING HOLE(S) <br />o rev 8 / 9 / <br />COLORADO DIVISION OF WATER RESOURCES -1313 SHERMAN ST -RM 821- DENVER -00-80203 <br />PHONE. 303 - 866 - 3581 -- -FAX. 303 - 866 -3589 5-6:- ,., /� <br />Location: 'A / , 1 y, Section / 7 <br />Township /S❑N cgS, Range 6p ❑Ekrw, 6 7- 1"M <br />County ` �?iLt 2 <br />Subdivision, Lot, Bik, Flg (as applicable) <br />Well Owner's Name, Addres & Phone Cc ? VG Je_D / / „/1/4 (O <br />QOX /9/, 4 C r OP CO oPpe6,0 <br />C C (/ / . /A/ /, CO <br />Please check one and complete as indicated including contact info. <br />❑ Water Well Driller Licensed in Colorado - Lic No. <br />❑ Professional Engineer Registered in Colorado - Reg. No. <br />❑ Professional Geologist per CRS 34 -1- 201(3) <br />Other - anyone directly employed by or under the supervision of a licensed driller, <br />registered professional engineer or professional ge logist // cD /l <br />Contact / Company 4.4.k. 4.4.k. G!� i4 CC d/" Go /� <br />,04'(Q <br />doP60 y <br />Fax 7/ / r t�+f/ '.)'Z.S <br />Site /Property Address <br />GPS Location in UTM format (optional): <br />Set GPS unit to true north, datum NAD83, and use meters for <br />the distance units, Zone 12 or ❑Zone 13 <br />Easting Northing <br /># of Monitoring Hole(s to be constructed: / <br />Estimated Depth Hole(s <br />Aquifer <br />Purpose of Monitoring Hole(s) / <br />L✓�/2_ <br />ACKNOWLEDGEMENT FROM STATE ENGINEER'S OFFICE <br />FOR OFFICE USE ONLY <br />M H PROCESSED BY <br />Div. <br />WD <br />BAS MD DATE ACKNOWLEDGED <br />CONDITIONS OF MONITORING HOLE ACKNOWLEDGEMENT <br />A COPY OF THE WRITTEN NOTICE OR ACKNOWLEDGEMENT SHALL BE AVAILABLE AT THE DRILLING SITE. <br />1) Notice was provided to the State Engineer at least 3 days prior to construction of monitoring & observation hole(s). <br />2) Construction of the hole(s) must be completed within 90 days of the date notice was given to the State Engineer. Testing and /or <br />pumping shall not exceed a total of 200 hours unless prior written approval is obtained from the State Engineer. Water diverted dunng testing <br />shall not be used for beneficial purposes. The owner of the hole(s) is responsible for obtaining permit(s) and complying with all rules and <br />regulations pertaining to the discharge of fluids produced during testing. <br />3) All work must comply with the Water Well Construction Rules, 2 CCR 402 -2. Minimum construction standards must be met or a variance <br />obtained. Standard permit application and work report forms are found on the DWR website at http:iin«w.water.state,co.ru. Well <br />Construction and Test Reports (GWS -31) must be completed for each hole drilled. The licensed contractor or authorized individual must <br />submit the completed forms to this office within 60 days of monitoring hole completion. <br />4) Unless a well permit is obtained, the hole(s) must be plugged and sealed within one (1) year after construction. An Abandonment <br />Report (form GWS -9) must be submitted within 60 days of plugging & sealing. The above MH acknowledgement number, owner's <br />structure name, and owner's name and address must be provided on all well permit application(s), well construction and abandonment reports. <br />5) The owner of the hole(s) shall maintain records of water quality testing and submit this data to the State Engineer upon request. <br />6) A MONITORING HOLE CANNOT BE CONVERTED TO A PRODUCTION WATER WELL, except for purposes of remediation (recovery) <br />or as a permanent dewatering system, if constructed in accordance with the Water Well Construction Rules and policies of the State <br />Engineer. <br />7) IF HOLES WILL NOT BE CONSTRUCTED UNDER THIS NOTICE WITHIN 90 DAYS, PLEASE WRITE, "NO HOLES CONSTRUCTED' ON A <br />COPY OF THE ACKNOWLEDGED NOTICE WITH THE FILE NUMBER AND FAX THE COPY TO THE DIVISION OF WATER RESOURCES <br />THIS ACKNOWLEDGEMENT OF NOTICE DOES NOT INDICATE THAT WELL PERMIT(S) CAN BE APPROVED. <br />Anticipated Date of Construction: <br />/2- -.20 <br />Date Notice Submitted: /2" 9 <br />(Must be at least 3 days prior to construction) <br />(Use above space for labels or additional conditions as needed) <br />
The URL can be used to link to this page
Your browser does not support the video tag.