Laserfiche WebLink
Address <br />Signature: <br />DIV. WD <br />NOTICE OF INTENT TO CONSTRUCT MONITORING HOLE(S) <br />C Sig 6/9 /S <br />COLORADO DIVISION OF WATER RESOURCES -1313 SHERMAN ST -RM 8 21- DENVER -00-80203 <br />PHONE. 303 - 866 - 3581 -- -FAX: 303 - 866 -3589 <br />GWS - 51 <br />08/2008 Please type or print legibly in black or blue ink <br />Well Owner's Name, Addres & Phone �� f` vG Jc0 <br />/° &, & /9/ U� cra5 CO cpabo <br />Landowner's Name C , V (O <br />Please check one and complete as indicated including contact info: <br />❑ Water Well Driller Licensed in Colorado - Lic. No. <br />❑ Professional Engineer Registered in Colorado - Reg No. <br />❑ Professional Geologist per CRS 34 -1- 201(3) <br />A t Other - anyone directly employed by or under the supervision of a licensed driller, <br />registered professional engineer or <br />! ! professional ge logist � / /i <br />Contact / Company . G / <br />.✓C Y� 1 G EJ /� <br />,✓ '(Q <br />/ �, <br />City, State & Zip £-7VQ (0 <br />p <br />Phone 7/�1- 6d1-4 ye <br />Fax 7/ r 6O - .-? .2 .� / <br />Print Name: /74W 4"/O / <br />ACKNOWLEDGEMENT FROM STATE ENGINEER'S OFFICE <br />FOR OFFICE USE ONLY <br />- MH PROCESSED BY <br />BAS MD DATE ACKNOWLEDGED <br />-rte /6 <br />Location: '/. ' /. , Section <br />Township /-S NS, Range +o, ❑Elow, 6 T PM <br />County ! e?i - 2 <br />Subdivision, Lot, Blk, Flg (as applicable) <br />Site /Property Address <br />GPS Location in UTM format (optional): <br />Set GPS unit to true north, datum NAD83, and use meters for <br />the distance units, ❑Zone 12 or ['Zone 13 <br />Easting Northing <br /># of Monitoring Holes to be constructed: / <br />Estimated Depth < Q Ft., Aquifer <br />Purpose of Monitoring Hole(s) / s t/I 7 4 h_ <br />Anticipated Date of Construction: <br />Date Notice Submitted: /2- 0 /' // <br />(Must be at least 3 days prior to construction) <br />CONDITIONS OF MONITORING HOLE ACKNOWLEDGEMENT <br />A COPY OF THE WRITTEN NOTICE OR ACKNOWLEDGEMENT SHALL BE AVAILABLE AT THE DRILLING SITE. <br />1) Notice was provided to the State Engineer at least 3 days prior to construction of monitoring & observation hole(s). <br />2) Construction of the hole(s) must be completed within 90 days of the date notice was given to the State Engineer. Testing and /or <br />pumping shall not exceed a total of 200 hours unless prior written approval is obtained from the State Engineer. Water diverted during testing <br />shall not be used for beneficial purposes. The owner of the hole(s) is responsible for obtaining permit(s) and complying with all rules and <br />regulations pertaining to the discharge of fluids produced during testing. <br />3) All work must comply with the Water Well Construction Rules, 2 CCR 402 -2. Minimum construction standards must be met or a variance <br />obtained. Standard permit application and work report forms are found on the DWR website at http: //www.water.state.co.us. Well <br />Construction and Test Reports (GWS -31) must be completed for each hole drilled. The licensed contractor or authorized individual must <br />submit the completed forms to this office within 60 days of monitoring hole completion. <br />4) Unless a well permit is obtained, the hole(s) must be plugged and sealed within one (1) year after construction. An Abandonment <br />Report (form GWS -9) must be submitted within 60 days of plugging & sealing. The above MH acknowledgement number, owner's <br />structure name, and owner's name and address must be provided on all well permit application(s), well construction and abandonment reports. <br />5) The owner of the hole(s) shall maintain records of water quality testing and submit this data to the State Engineer upon request. <br />6) A MONITORING HOLE CANNOT BE CONVERTED TO A PRODUCTION WATER WELL, except for purposes of remediation (recovery) <br />or as a permanent dewatering system, if constructed in accordance with the Water Well Construction Rules and policies of the State <br />Engineer. <br />7) IF HOLES WILL NOT BE CONSTRUCTED UNDER THIS NOTICE WITHIN 90 DAYS, PLEASE WRITE, "NO HOLES CONSTRUCTED" ON A <br />COPY OF THE ACKNOWLEDGED NOTICE WITH THE FILE NUMBER AND FAX THE COPY TO THE DIVISION OF WATER RESOURCES. <br />THIS ACKNOWLEDGEMENT OF NOTICE DOES NOT INDICATE THAT WELL PERMIT(S) CAN BE APPROVED. <br />(Use above space for labels or additional conditions as needed) <br />