Laserfiche WebLink
GWS-51 NOTICE OF INTENT TO CONSTRUCT MONITORING HOLE(S) <br />08/2008 NOTICE <br />type or print legibly in black or blue ink <br />Well Owner's Name, Addres & Phone VG, t)C-D 4,1././/v4 �Q <br />gOX /9 G r04 Co i?ocbo <br />Landowner's Name ( C 49Z, /7/A///1 <br />Please check one and complete as indicated including contact info <br />❑ Water Well Dnller Licensed in Colorado — Lic No. <br />❑ Professional Engineer Registered in Colorado — Reg. No. <br />❑ Professional Geologist per CRS 34 -1- 201(3) <br />A Other - anyone directly employed by or under the supervision of a licensed driller, <br />registered professional engineer or professional ge9logist <br />/ /i <br />Contact / Company .4 G;/f M2 <br />Address 4X / <br />City, State & Zip C v/ LTV s .. (G2 <br />Phone 7 /1�-l�/- <br />Print Name: <br />Signature: <br />COLORADO DIVISION OF WATER RESOURCES -1313 SHERMAN ST -RM 821 - DENVER -CO -80203 <br />PHONE: 303 - 866 - 3581 -- -FAX: 303 - 866 -3589 <br />Fax <br />do o6.7 <br />7/9 - a9- 3 -zs - y <br />0 <br />Location: N 1 /4 A t '/, Section -2-/ <br />Township73 ❑N NS, Range 6.2 ❑EZW, 6 T PM <br />County <br />Subdivision, Lot, Blk, Flg (as applicable) <br />Site /Property Address <br />ACKNOWLEDGEMENT FROM STATE ENGINEER'S OFFICE <br />FOR OFFICE USE ONLY <br />MH PROCESSED BY <br />GPS Location in UTM format (optional): <br />Set GPS unit to true north, datum NAD83, and use meters for <br />the distance units, ❑Zone 12 or Zone 13. <br />Easting Northing <br /># of Monitoring Holes to be constructed: <br />Estimated Depth < O Ft., Aquifer if <br />Purpose of Monitoring Hole(s) / sp t// T O/e fi4 4 2 _ <br />Anticipated Date of Construction: LI / 7 <br />Date Notice Submitted: /2" C 9--/f2 <br />(Must be at least 3 days prior to construction) <br />Div. WD BAS MD DATE ACKNOWLEDGED <br />CONDITIONS OF MONITORING HOLE ACKNOWLEDGEMENT <br />A COPY OF THE WRITTEN NOTICE OR ACKNOWLEDGEMENT SHALL BE AVAILABLE AT THE DRILLING SITE. <br />1) Notice was provided to the State Engineer at least 3 days prior to construction of monitoring & observation hole(s). <br />2) Construction of the hole(s) must be completed within 90 days of the date notice was given to the State Engineer. Testing and /or <br />pumping shall not exceed a total of 200 hours unless prior written approval is obtained from the State Engineer. Water diverted during testing <br />shall not be used for beneficial purposes. The owner of the hole(s) is responsible for obtaining permit(s) and complying with at rules and <br />regulations pertaining to the discharge of fluids produced during testing. <br />3) All work must comply with the Water Well Construction Rules, 2 CCR 402 -2. Minimum construction standards must be met or a variance <br />obtained. Standard permit application and work report forms are found on the DWR website at http :/ /wwwAvaterstatc.co.u,. Well <br />Construction and Test Reports (GWS -31) must be completed for each hole drilled. The licensed contractor or authorized individual must <br />submit the completed forms to this office within 60 days of monitoring hole completion. <br />4) Unless a well permit is obtained, the hole(s) must be plugged and sealed within one (1) year after construction. An Abandonment <br />Report (form GWS -9) must be submitted within 60 days of plugging & sealing. The above MH acknowledgement number, owner's <br />structure name, and owner's name and address must be provided on all well permit application(s), well construction and abandonment reports. <br />5) The owner of the hole(s) shall maintain records of water quality testing and submit this data to the State Engineer upon request <br />6) A MONITORING HOLE CANNOT BE CONVERTED TO A PRODUCTION WATER WELL, except for purposes of remediation (recovery) <br />or as a permanent dewatering system, if constructed in accordance with the Water Well Construction Rules and policies of the State <br />Engineer. <br />7) IF HOLES WILL NOT BE CONSTRUCTED UNDER THIS NOTICE WITHIN 90 DAYS, PLEASE WRITE, "NO HOLES CONSTRUCTED' ON A <br />COPY OF THE ACKNOWLEDGED NOTICE WITH THE FILE NUMBER AND FAX THE COPY TO THE DIVISION OF WATER RESOURCES, <br />THIS ACKNOWLEDGEMENT OF NOTICE DOES NOT INDICATE THAT WELL PERMIT(S) CAN BE APPROVED. <br />(Use above space for labels or additional conditions as needed) <br />