Laserfiche WebLink
•11 -18 -10 <br />Signature: <br />07:10 FROM -Colo Div of Water Resources +3038663589 T -450 P 001 /001 F -403 <br />Ow8.51 NOTICE OF INTENT TO CONSTRUCT MONITORING HOLE(S) <br />0812008 Please type or print legibly In black or blue Ink O <br />COLORADO DIVISION OF WATER RESOURCES -1313 SHERMAN ST -RM 821-DENVER-00-80203 <br />PHONE 303.8e6- 3581 —FAX; 303- 866 -3580 <br />v <br />/.a9,,Bgb /9/ UI,CO IF <br />Landowner's Name <br />Please cheek one and complete as Indicated Including contact Info: <br />❑ Water Well Driller Licensed In Colorado - Lis No. <br />O Professional Engineer Registered in Colorado - Reg. No. <br />O Professional Geologist per CRS 34-1-201(3) <br />g other stered - anyon eselorel enge dkedty ineer o employed r by or under oto the gist auparvIaion of e licensed driller, <br />g l prof lxo ga <br />Contact / Company CGe!/4..ro /2.4,..,6 <br />Address f ` O ff , )o /9/ <br />' <br />City, Sista & Zip 4r04 <br />Phone 7 /9- -616 —Vote Fax 7 4 „,,a',/ <br />Print Name: V <br />i f <br />Well Owner's Name, Address & Phone 64 <br />ACKNOWLEDGEMENT FROM STATE ENGINEER'S OFFICE <br />FOR OFFICE USE ONLY <br />- MH PROCESSED BY <br />Div, <br />WD BAS MD DATE ACKNOWLEDGED tt' 1 D <br />CONDITIONS OF MONITORING HOLE ACKNOWLEDGEMENT <br />A COPY OF THE WRITTEN NOTICE OR ACKNOWLEDGEMENT SHALL BE AVAILABLE AT THE DRIWNG SITE. <br />1) Notice was provided to the State Engineer at least 3 days prior to constntction of monitoring & observation hole(s). <br />2) Construction of the hole(s) must be completed within 90 days of the data notice was ghren to the State Engineer. Testing and/or <br />pumping shall not exceed a total of 200 hours unless prior written approval is obtained front the State Engineer, Water diverted during testing <br />ghglIzet be used for beneficial purposes, The owner of the hole(s) le responsible for oblalning permit(s) and complying with all rules and <br />regulations pertaining to the discharge of fluids produced during testing. <br />3) All work must comply with the Water Well Construction Rules, 2 CCR 402-2. Minimum construction standards must be mot or a variance <br />obtained. Standard permit application and work report forms are found on the DWR webelte at htlul/rwww.water.state.ce.ut. Well <br />Construction and Test Reports (GWS31) must be completed for each hole drilled. The licensed contractor or authorized Individual must <br />eubmlt the ooapleted forms to this office within 80 days of monitoring hole completion. <br />4 ) Unless a well permit fa obtained, the hole(s) must be plugged and sealed within ono (1) year after construction. An Abandonment <br />Report (form GWS■9) must be submitted within 80 days of plugging & sealing. The above MH aoknowledgement number, owners <br />structure name, and owner's name and address must be provided on all well permit epplicadon(s), well construction and abandonment reports. <br />5) The owner of the hole(a) shall maintain records of water quality testing and submit this data to the State Engineer upon request. <br />8) A MONITORING HOLE CANNOT BE CONVERTED TO A PRODUCTION WATER WELL, except for purposes of mmediatlon (recovery) <br />or as a permanent dewatering system, if constructed In accordance with the Water Well Construction Rules and policies of the State <br />Engineer. <br />7 ) iF HOLES WILL NOT BE CONSTRUCTED UNDER THiS NOTICE WITHIN 90 DAYS, PLEASE WRITE, "NO HOLES CONSTRUCTED” ON A <br />COPY OF THE ACKNOWLEDGED NOTICE WITH THE FILE NUMBER AND FAX THE COPY TO THE DIVISION OF WATER RESOURCES. <br />THIS ACKNOWLEDGEMENT OF NOTICE DOES NOT INDICATE THAT WELL PERMIT(S) CAN BE APPROVED. <br />Location: / <br />1 y, -SO K. Section / <br />Township , f„CON P. Range 69 ❑E WV. 6M <br />County <br />Subdivision, Lot. Blk, FIg (a applicable) <br />.evt4a <br />Site /Property Address 7.1:74164_C—e9422...? <br />✓1Y <br />GPS Location in UTM format (optional): <br />Set GPS unit to true north, datum NAD83, and use meters for <br />the distance unite, Ozone 12 or ❑ Zone 13. <br />Easting Northing <br /># of Monitoring Hole(s) to be constructed; <br />Estimated Depth 7J FL, Aquifer <br />Purpose of Monitoring Fiole(s) T 8E aidrEa2 <br />/0"illO /1c,Cre 44// rig/210W G✓ist-c- <br />Anticlpetod Date of Construction: // /9 7/ <br />Date Notice Submitted: /1- /6 —/ d <br />(Must be at least 3 days prior to construction) <br />(Use above space for lebois or addittonel conditions as needed) <br />