My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-09_GENERAL DOCUMENTS - P2011029
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P2011029
>
2011-11-09_GENERAL DOCUMENTS - P2011029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:53 PM
Creation date
1/30/2012 1:16:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011029
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
11/9/2011
Doc Name
Notice of Deficiencies
From
Greg Lewicki and Associates, PLLC
To
DRMS
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />None. All activities will take place within previously disturbed ground or sloughed talus <br />piles. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Drill holes will be cemented to the surface. All drillholes will be plugged within 30 days of <br />exploration activity, weather permitting. <br />6 (FORM 2 - Public filing) <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />The adit currently includes a bat gate. The bat gate will be reinstalled and safe guarded <br />from entry. The shaft will be plugged by excavating to the bedrock and capping with a <br />precast concrete slab. This slab will then be burled under compacted fill. <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />No roads will be built for this exploration activity. <br />
The URL can be used to link to this page
Your browser does not support the video tag.