Laserfiche WebLink
6 (FORM 1 - All information for DRMS use and confidential filing) <br />3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />None. All activities will take place within previously disturbed ground or sloughed talus <br />piles. <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Drill holes will be cemented to the surface. All dnllholes will be plugged within 30 days of <br />C�CNI oiatimi1 ca.tivily, wed 'i NCiumiilllHy. <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />The adit currently includes a bat gate. The bat gate will be reinstalled and safe guarded <br />trom entry. [he shatt will be plugged by excavating to the bedrock and capping with a <br />pi ct,obt conurele stab. then be boned uiudei Luiripauted fll. <br />6. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />No roads will he built for this exploration activity <br />