Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />Regrade and Backfill Surface Below Highwall <br />DOZER <br />Il Il <br />14.07 <br />$2,906.18 <br />$4,501.04 <br />$2,214.20 <br />$2,385.50 <br />$1,122.21 <br />3:1 Surface Below Highwall <br />DOZER <br />21.79 <br />Topsoil on Regraded Surface <br />DOZER <br />10.72 <br />Revegetation <br />REVEGE <br />5.00 <br />Mobilize/Demobilize <br />MOBILIZE <br />2.80 <br />SUBTOTALS: <br />5438 <br />$ $13,129.13 <br />Task description. Inspection <br />Site: Texas Creek Gray Pit <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 1/23/2012 County: La Plata <br />User: KAP <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />COST SUMMARY <br />Permit Action: 2012 Inspection Permit/Job #: M1980143 <br />Abbreviation: None <br />Filename: M143 -000 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 0.00 Total = $0.00 <br />Performance bond: 0.00 Total = $0.00 <br />Job superintendent: 27.19 Total= $1,612.37 <br />Profit: 10.00 Total = $1,312.91 <br />TOTAL 0 & P = $2,925.28 <br />CONTRACT AMOUNT (direct + O & P) = $16,054.41 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 Total = 500.00 <br />Engineering work and/or contract/bid preparation: 10.00 Total = $1,605.44 <br />Reclamation management and/or administration: 7.10 $1,139.86 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $6,170.58 <br />TOTAL BOND AMOUNT (direct + indirect) = $19,299.71 <br />