Laserfiche WebLink
Common Name <br />No / <br />Acre <br />Type and Size <br />Planting <br />Cost <br />Fertilizer <br />Pellet Cost <br />Cost /Acre <br />Power mulcher (MEANS 32 91 13.16 0250) <br />TON <br />$79.71 <br />$41.00 <br />Total Mulch Application Cost/Acre <br />$ <br />Totals Nursery Stock Cost / Acre <br />$0.00 <br />Description <br />Units / <br />Acre <br />Cost /Acre <br />Crimping, with tractor {DMG survey data) <br />Cost /Acre <br />$65.89 <br />Power mulcher (MEANS 32 91 13.16 0250) <br />TON <br />$79.71 <br />$41.00 <br />Total Mulch Application Cost/Acre <br />$145.60 <br />Description <br />Units / <br />Acre <br />Unit <br />Cost / Unit <br />Cost /Acre <br />Straw, delivered {MEANS 31 25 14.16 1200} <br />0.25 <br />TON <br />$164.00 <br />$41.00 <br />Total Mulch Materials Cost /Acre <br />$41.00 <br />Reveg Worksheet Cont'd <br />Task # 004 <br />Total Seed Application Cost /Acre <br />$90.11 <br />MULCHING and MISCELLANEOUS <br />Materials <br />Page 2 of 2 <br />Application <br />NURSERY STOCK PLANTING <br />JOB TIME AND COST <br />No. of Acres: 5 Cost /Acre: $414.87 <br />Estimated Failure Rate: 15% Cost /Acre *: $414.87 <br />*Selected Replanting Work Items: TILLING,SEEDING,MULCHING <br />Initial Job Cost: $2,07435 <br />Reseeding Job Cost: $311.15 <br />Total Job Cost: $2,385.50 <br />Job Hours: 5.00 <br />CIRCES Cost Estimating Software <br />