My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-23_HYDROLOGY - M1977439
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977439
>
2012-01-23_HYDROLOGY - M1977439
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:46 PM
Creation date
1/27/2012 8:09:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977439
IBM Index Class Name
HYDROLOGY
Doc Date
1/23/2012
Doc Name
Combined SWSP
From
OSE
To
Applegate Group, Inc.
Permit Index Doc Type
Hydrology Report
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table No. 5 <br />Lafarge West, Inc. <br />Upper Poudre River Combined SWSP <br />Projected 2012 Water Balance <br />(A) Taken from from Table 1 Column (H) <br />(B) Taken from Table 3 Column (E) <br />(C) Assuming 1.0 acre pond at gross evaporation rate <br />(D) _ (B) - (C) <br />(E) Taken from Appendix D <br />(F) Taken from Table No 3 Column (I) <br />(G) April through September. Column (B) * Column (F) October through March: Column (F) * total farm headgate delivery from previous irrigation season <br />(H) _ (E) - (A) - (G) <br />(I) Lease with the Lake Canal Reservoir Company, additional water released by LCRC to account for a transit loss of 4 1% <br />(J) = Column (H) + Column (I) <br />Prepared By. Applegate Group, Inc <br />Date Revised* 11/30/2011 <br />AG Job #. 10 -106 <br />WY 2011 FHD = 181.87 ac -ft <br />; 7ofal es6481n' ed, <br />' »Lafgged)Mihmgr , <br />( < *, D e e�,i,.t; <br />i1 <br />. <br />• �,(acre- {elet )': °' <br />:..Fa He <br />` ,:Dellke ry X forl5:75.,; <br />: S ^rshares t^ ", , <br />�i' <br />�'�.r; °(et); °'', <br />acre - f <br />( ^estimated° " „ ,' <br />z < ;Recharge .Pit, ° <br />' sEvapiLo ;, <br />��acre- feet)'v „ <br />( C) <br />, <br />`'' ^' . - •' <br />"N e tRecharge,', <br />"(acre= feet:) <br />, (1 - * <br />Lagged <br />.'• ; `Recharge <br />i Creditfrom Net <br />Recharge <br />(acre -feet) <br />._ (E) <br />-: ",Return Flow <br />Factor - <br />'(acre -feet) <br />'(F) <br />Return Flow <br />Obligations <br />‘(acre"-feet)'; <br />(G)' <br />Initial Net Impact <br />to' the,Poudre <br />River <br />"(acre= feet).; � <br />(H) <br />LCRC Lease. <br />tyi( acre- feet),`, <br />(I) <br />FinafMonthly <br />, .,Impact'to ' <br />rPoudre +River <br />;";(`acre= fe'et) ° <br />( Kjp,. <br />Jan -12 <br />1.47 <br />0.00 <br />0.00 <br />9.20 <br />0 41% <br />0.75 <br />6 99 <br />6.99 <br />Feb -12 <br />1.17 <br />0.00 <br />0.00 <br />7 54 <br />0 34% <br />0.61 <br />5 75 <br />5,75 <br />Mar -12 <br />2.51 <br />0 00 <br />0.00 <br />6.22 <br />0.28% <br />0.51 <br />3.20 <br />3.20 <br />Apr -12 <br />4.40 <br />2,94 <br />0.29 <br />2.65 <br />5.64 <br />53 72% <br />1.58 <br />-0 34 <br />2 0 <br />1.66 <br />May -12 <br />6.47 <br />41.78 <br />0.38 <br />41 40 <br />12.70 <br />62.90% <br />26 28 <br />-20 05 <br />23 0 <br />2.95 <br />Jun -12 <br />9 17 <br />53.79 <br />0.46 <br />53 33 <br />24.99 <br />37.92% <br />20.40 <br />-4.58 <br />7.0 <br />2.42 <br />Jul -12 <br />11.76 <br />56 73 <br />0.48 <br />56 26 <br />32 92 <br />40.70% <br />23.09 <br />-1.93 <br />4.0 <br />2.07 <br />Aug -12 <br />12.17 <br />48.88 <br />0.43 <br />48 45 <br />36.33 <br />42.92% <br />20.98 <br />3 18 <br />3 18 <br />Sep -12 <br />10.44 <br />31.47 <br />0.32 <br />31.15 <br />34.33 <br />47 22% <br />14 86 <br />9.03 <br />9.03 <br />Oct -12 <br />8 39 <br />4 73 <br />0 22 <br />4.51 <br />26 40 <br />0 04% <br />0.11 <br />17.91 <br />17.91 <br />Nov -12 <br />5.86 <br />0.00 <br />0.00 <br />17.87 <br />0 75% <br />1.80 <br />10 22 <br />10.22 <br />Dec -12 <br />3.53 <br />0.00 <br />0 00 <br />13 48 <br />0.51% <br />1.23 <br />8.72 <br />8.72 <br />Total <br />77.34 <br />240.31 <br />2.57 <br />237.75 <br />227.62 <br />- <br />112.19 <br />38.09 <br />36.0 <br />74.09 <br />Table No. 5 <br />Lafarge West, Inc. <br />Upper Poudre River Combined SWSP <br />Projected 2012 Water Balance <br />(A) Taken from from Table 1 Column (H) <br />(B) Taken from Table 3 Column (E) <br />(C) Assuming 1.0 acre pond at gross evaporation rate <br />(D) _ (B) - (C) <br />(E) Taken from Appendix D <br />(F) Taken from Table No 3 Column (I) <br />(G) April through September. Column (B) * Column (F) October through March: Column (F) * total farm headgate delivery from previous irrigation season <br />(H) _ (E) - (A) - (G) <br />(I) Lease with the Lake Canal Reservoir Company, additional water released by LCRC to account for a transit loss of 4 1% <br />(J) = Column (H) + Column (I) <br />Prepared By. Applegate Group, Inc <br />Date Revised* 11/30/2011 <br />AG Job #. 10 -106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.