My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-17_REVISION - M1982141
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982141
>
2012-01-17_REVISION - M1982141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:25 AM
Creation date
1/25/2012 11:21:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982141
IBM Index Class Name
REVISION
Doc Date
1/17/2012
Doc Name
Notice of Surety Increase
From
DRMS
To
Moffat Limestone Company
Type & Sequence
SI1
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Surface Blasting Work Cont'd <br />BLASTING MATERIALS QUANTITIES <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />Total work team cost/hour: $318.07 <br />MATERIALS COST <br />Drilling Equipment - Drill: <br />-Drill Pad Preparation: <br />Misc. Drill Support Equipment: <br />Misc. Explosives Support Equipment: <br />Explosives Delivery —Bulk Truck: <br />-Cap Truck: <br />Drilling <br />Equipment <br />Task# O 1 A <br />Drill Pad <br />Preparation <br />Description <br />Shift basis: 1 per day <br />ATLAS COPCO ROC D7- 11,4.0 in. <br />Cat D8T - 8SU <br />NA <br />NA <br />NA <br />NA <br />Misc. Drill <br />Support <br />Misc. Expl. <br />Sunnort <br />Page 2 of 3 <br />Explosives Delivery <br />Bulk Truck Can Truck <br />CIRCES Cost Estimating Software <br />QUANTITY <br />UNIT <br />Total Quantity of Stemming Required: <br />1.40 <br />cubic yards <br />Total Quantity of Explosives Required: <br />3,733 <br />pounds <br />Total Quantity of det. cord/fuse /wire Required: <br />2,178 <br />linear feet <br />Quantity of Blasting Caps per Blasthole: <br />1 <br />cap(s) <br />Total Quantity of Blasting Caps Required: <br />90 <br />caps <br />Quantity of Primers per Blasthole: <br />1 <br />primer(s) <br />Total Quantity of Primers Required: <br />90 <br />primers <br />Quantity of Delays per Blasthole: <br />1 <br />delay(s) <br />Total Quantity of Delays Required: <br />93 <br />delays <br />Surface Blasting Work Cont'd <br />BLASTING MATERIALS QUANTITIES <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />Total work team cost/hour: $318.07 <br />MATERIALS COST <br />Drilling Equipment - Drill: <br />-Drill Pad Preparation: <br />Misc. Drill Support Equipment: <br />Misc. Explosives Support Equipment: <br />Explosives Delivery —Bulk Truck: <br />-Cap Truck: <br />Drilling <br />Equipment <br />Task# O 1 A <br />Drill Pad <br />Preparation <br />Description <br />Shift basis: 1 per day <br />ATLAS COPCO ROC D7- 11,4.0 in. <br />Cat D8T - 8SU <br />NA <br />NA <br />NA <br />NA <br />Misc. Drill <br />Support <br />Misc. Expl. <br />Sunnort <br />Page 2 of 3 <br />Explosives Delivery <br />Bulk Truck Can Truck <br />CIRCES Cost Estimating Software <br />Drilling <br />Dozer <br />Unit Cost <br />Quantity <br />Total Cost <br />Blasting Agent: <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$48.87 <br />$58.56 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$69.35 <br />$102.81 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost /hour: <br />$0.00 <br />$38.49 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$118.21 <br />$199.86 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Number of Units: <br />1 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />$118.21 <br />$199.86 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Surface Blasting Work Cont'd <br />BLASTING MATERIALS QUANTITIES <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />Total work team cost/hour: $318.07 <br />MATERIALS COST <br />Drilling Equipment - Drill: <br />-Drill Pad Preparation: <br />Misc. Drill Support Equipment: <br />Misc. Explosives Support Equipment: <br />Explosives Delivery —Bulk Truck: <br />-Cap Truck: <br />Drilling <br />Equipment <br />Task# O 1 A <br />Drill Pad <br />Preparation <br />Description <br />Shift basis: 1 per day <br />ATLAS COPCO ROC D7- 11,4.0 in. <br />Cat D8T - 8SU <br />NA <br />NA <br />NA <br />NA <br />Misc. Drill <br />Support <br />Misc. Expl. <br />Sunnort <br />Page 2 of 3 <br />Explosives Delivery <br />Bulk Truck Can Truck <br />CIRCES Cost Estimating Software <br />Description <br />Unit <br />Unit Cost <br />Quantity <br />Total Cost <br />Blasting Agent: <br />Bulk ANFO high density ( <br />7,900 - 15,000 fps) <br />Pound <br />$0.340 <br />3733.333 <br />$1,269.33 <br />Primers or Boosters: <br />Aluminized ANFO booster <br />(electric or non - electric <br />system) <br />Bag <br />$11.777 <br />90.000 <br />$1,059.93 <br />Blasting Caps: <br />Electric cap, inst. (electric <br />systems) <br />Each <br />$21.210 <br />90.000 <br />$1,908.90 <br />Det. Cord, fuse, or <br />wire: <br />Blasting wire, 12 -14 gage <br />(electric systems) <br />Linear foot <br />$0.088 <br />2178.000 <br />$191.66 <br />Delays: <br />NO DELAY MATERIALS <br />REQUIRED <br />Expl. magazine - agent <br />(rental basis - meet MSHA <br />req.) <br />Bit life = 1,400 <br />NA <br />Day <br />Linear feet <br />$0.000 <br />$6.106 <br />$1,093.00 <br />93.000 <br />0.000 <br />0.754 <br />$0.00 <br />$0.00 <br />$824.43 <br />Miscellaneous: <br />Drill bits: <br />Surface Blasting Work Cont'd <br />BLASTING MATERIALS QUANTITIES <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />Total work team cost/hour: $318.07 <br />MATERIALS COST <br />Drilling Equipment - Drill: <br />-Drill Pad Preparation: <br />Misc. Drill Support Equipment: <br />Misc. Explosives Support Equipment: <br />Explosives Delivery —Bulk Truck: <br />-Cap Truck: <br />Drilling <br />Equipment <br />Task# O 1 A <br />Drill Pad <br />Preparation <br />Description <br />Shift basis: 1 per day <br />ATLAS COPCO ROC D7- 11,4.0 in. <br />Cat D8T - 8SU <br />NA <br />NA <br />NA <br />NA <br />Misc. Drill <br />Support <br />Misc. Expl. <br />Sunnort <br />Page 2 of 3 <br />Explosives Delivery <br />Bulk Truck Can Truck <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.