Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />AM1 Area <br />0 1a <br />Highwall Reduction (AM1) <br />BLASTING <br />1 <br />30.72 <br />$9,965.87 <br />02a <br />AM1 Highwall reduction (grade HW) <br />DOZER <br />1 <br />5.67 <br />$1,133.67 <br />03a <br />AM1 Removal of mining equipment and debris <br />DEMOLISH <br />1 <br />5.00 <br />$1,186.39 <br />04a <br />AM 1 Rip process area and access road <br />RIPPER <br />1 <br />6.32 <br />$1,348.00 <br />05a <br />AM1 Distribute topsoil throughout disturbed area <br />LOADER <br />1 <br />14.96 <br />$2,106.00 <br />06a <br />AM1 Spread topsoil <br />DOZER <br />1 <br />6.61 <br />$1,320.31 <br />07a <br />AM1 Revegetate disturbed area <br />REVEGE <br />1 <br />24.00 <br />$11,968.65 <br />CN1 Area <br />08a <br />CN1 Remove mining equipment and debris <br />DEMOLISH <br />1 <br />8.00 <br />$5,216.88 <br />09a <br />Highwall Reduction (Lower/North HW) <br />BLASTING <br />1 <br />102.41 <br />$33,214.18 <br />09b <br />Highwall Reduction (Upper /South HW) <br />BLASTING <br />1 <br />51.20 <br />$16,608.26 <br />l0a <br />Highwall reduction (grade HW) <br />DOZER <br />1 <br />28.37 <br />$5,669.02 <br />1 la <br />CN1 Rip pit floor, process area and roads <br />RIPPER <br />1 <br />7.79 <br />$1,660.00 <br />12a <br />CN1 Distribute topsoil throughout disturbed area <br />LOADER <br />1 <br />30.75 <br />$4,328.00 <br />13a <br />CN1 Distribute topsoil throughout disturbed area <br />DOZER <br />1 <br />8.26 <br />$1,650.38 <br />14a <br />CN1 Revegetate disturbed area <br />REVEGE <br />1 <br />30.00 <br />$15,712.16 <br />15a <br />Mobilize reclamation crew and equipment <br />MOBILIZE <br />1 <br />4.66 <br />$5,630.12 <br />SUBTOTALS: <br />364.72 <br />$118,717.89 <br />Task description: <br />Site: Juniper Quarry <br />PROJECT IDENTIFICATION <br />TASK LIST (DIRECT COSTS) <br />Financial Warranty Adequacy Review <br />Task #: 000 State: Colorado <br />Date: 1/13/2012 County: Moffat <br />User: DMC <br />Agency or organization name: DRMS <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $2,398.10 <br />Performance bond: 1.05 Total = $1,246.54 <br />Job superintendent: 208.13 Total = $12,342.11 <br />Profit: 10.00 Total = $11,871.79 <br />TOTAL 0 & P = $27,858.54 <br />CONTRACT AMOUNT (direct + 0 & P) = $146,576.43 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and /or contract/bid preparation: <br />Reclamation management and /or administration: <br />COST SUMMARY <br />Permit Action: SI -1 Permit/Job #: M1982141 <br />500.00 <br />0.00 <br />5.00 <br />Abbreviation: None <br />Filename- M141 -000 <br />Total = <br />Total = <br />500.00 <br />$0.00 <br />$7,328.82 <br />TOTAL INDIRECT COST = $35,687.36 <br />TOTAL BOND AMOUNT (direct + indirect) = $154,405 <br />