Laserfiche WebLink
Loader Worksheet Cont'd <br />Load Bucket Capacity <br />Rated Capacity: 5.60 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - uniform aggregates to 1/8" (95 -100 %) 0.975 <br />Adjusted Capacity: 5.46 LCY <br />Job Condition Correction Factors <br />Site Altitude: 6600 feet <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />1.00 <br />0.83 <br />0.83 <br />Task # 12A Page 2 of 2 <br />Source <br />(CAT HB) <br />(1 shift /day) <br />multiplier <br />Total Travel Time: 0.8771 minutes <br />Total Cycle Time: 1.3821 minutes <br />Unadjusted Hourly Unit Production: _ 237.03 LCY/Hour <br />Adjusted Hourly Unit Production: 196.74 LCY/Hour <br />Adjusted Hourly Fleet Production: 196.74 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: 30.75 Hours <br />Unit cost: $0.715 /LCY Total job cost: $4,328.00 <br />CIRCES Cost Estimating Software <br />