Laserfiche WebLink
Surface Blasting Work Cont'd <br />BLASTING MATERIALS QUANTITIES <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />MATERIALS COST <br />Drilling Equipment - Drill: <br />-Drill Pad Preparation: <br />Misc. Drill Support Equipment: <br />Misc. Explosives Support Equipment: <br />Explosives Delivery —Bulk Truck: <br />-Cap Truck: <br />Total work team cost/hour: $318.07 <br />Drilling <br />Equipment <br />Task# 09A <br />NA <br />NA <br />NA <br />Drill Pad <br />Preparation <br />Description <br />Misc. Drill <br />Support <br />Shift basis: 1 per day <br />ATLAS COPCO ROC D7- 11,4.0 in. <br />Cat D8T - 8SU <br />NA <br />Page 2 of 3 <br />Misc. Expl. Explosives Delivery <br />Support Bulk Truck Cap Truck <br />CIRCES Cost Estimating Software <br />QUANTITY <br />UNIT <br />Total Quantity of Stemming Required: <br />4.67 <br />cubic yards <br />Total Quantity of Explosives Required: <br />12,444 <br />pounds <br />Total Quantity of det. cord/fuse /wire Required: <br />7,198 <br />linear feet <br />Quantity of Blasting Caps per Blasthole: <br />1 <br />cap(s) <br />Total Quantity of Blasting Caps Required: <br />300 <br />caps <br />Quantity of Primers per Blasthole: <br />1 <br />primer(s) <br />Total Quantity of Primers Required: <br />300 <br />primers <br />Quantity of Delays per Blasthole: <br />1 <br />delay(s) <br />Total Quantity of Delays Required: <br />303 <br />delays <br />Surface Blasting Work Cont'd <br />BLASTING MATERIALS QUANTITIES <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />MATERIALS COST <br />Drilling Equipment - Drill: <br />-Drill Pad Preparation: <br />Misc. Drill Support Equipment: <br />Misc. Explosives Support Equipment: <br />Explosives Delivery —Bulk Truck: <br />-Cap Truck: <br />Total work team cost/hour: $318.07 <br />Drilling <br />Equipment <br />Task# 09A <br />NA <br />NA <br />NA <br />Drill Pad <br />Preparation <br />Description <br />Misc. Drill <br />Support <br />Shift basis: 1 per day <br />ATLAS COPCO ROC D7- 11,4.0 in. <br />Cat D8T - 8SU <br />NA <br />Page 2 of 3 <br />Misc. Expl. Explosives Delivery <br />Support Bulk Truck Cap Truck <br />CIRCES Cost Estimating Software <br />Drilling <br />Dozer <br />Unit Cost <br />Quantity <br />Total Cost <br />Blasting Agent: <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$48.87 <br />$58.56 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$69.35 <br />$102.81 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$38.49 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$118.21 <br />$199.86 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Number of Units: <br />1 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />$118.21 <br />$199.86 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Surface Blasting Work Cont'd <br />BLASTING MATERIALS QUANTITIES <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />MATERIALS COST <br />Drilling Equipment - Drill: <br />-Drill Pad Preparation: <br />Misc. Drill Support Equipment: <br />Misc. Explosives Support Equipment: <br />Explosives Delivery —Bulk Truck: <br />-Cap Truck: <br />Total work team cost/hour: $318.07 <br />Drilling <br />Equipment <br />Task# 09A <br />NA <br />NA <br />NA <br />Drill Pad <br />Preparation <br />Description <br />Misc. Drill <br />Support <br />Shift basis: 1 per day <br />ATLAS COPCO ROC D7- 11,4.0 in. <br />Cat D8T - 8SU <br />NA <br />Page 2 of 3 <br />Misc. Expl. Explosives Delivery <br />Support Bulk Truck Cap Truck <br />CIRCES Cost Estimating Software <br />Description <br />Unit <br />Unit Cost <br />Quantity <br />Total Cost <br />Blasting Agent: <br />Bulk ANFO high density ( <br />7,900 - 15,000 fps) <br />Pound <br />$0.340 <br />12444.444 <br />$4,231.11 <br />Primers or Boosters: <br />Aluminized ANFO booster <br />(electric or non - electric <br />system) <br />Bag <br />$11.777 <br />300.000 <br />$3,533.10 <br />Blasting Caps: <br />Electric cap, inst. (electric <br />systems) <br />Each <br />$21.210 <br />300.000 <br />$6,363.00 <br />Det. Cord, fuse, or <br />wire: <br />Blasting wire, 12 -14 gage <br />(electric systems) <br />Linear foot <br />$0.088 <br />7198.400 <br />$633.46 <br />Delays: <br />NO DELAY MATERIALS <br />REQUIRED <br />NA <br />$0.000 <br />303.000 <br />$0.00 <br />Miscellaneous: <br />Expl. magazine - agent <br />(rental basis - meet MSHA <br />req.) <br />Day <br />$6.106 <br />0.000 <br />$0.00 <br />Drill bits: <br />Bit life = 1,400 <br />Linear feet <br />$1,093.00 <br />2.514 <br />$2,748.11 <br />Surface Blasting Work Cont'd <br />BLASTING MATERIALS QUANTITIES <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />MATERIALS COST <br />Drilling Equipment - Drill: <br />-Drill Pad Preparation: <br />Misc. Drill Support Equipment: <br />Misc. Explosives Support Equipment: <br />Explosives Delivery —Bulk Truck: <br />-Cap Truck: <br />Total work team cost/hour: $318.07 <br />Drilling <br />Equipment <br />Task# 09A <br />NA <br />NA <br />NA <br />Drill Pad <br />Preparation <br />Description <br />Misc. Drill <br />Support <br />Shift basis: 1 per day <br />ATLAS COPCO ROC D7- 11,4.0 in. <br />Cat D8T - 8SU <br />NA <br />Page 2 of 3 <br />Misc. Expl. Explosives Delivery <br />Support Bulk Truck Cap Truck <br />CIRCES Cost Estimating Software <br />