Laserfiche WebLink
Task description: <br />Site: Juniper Quarry <br />PROJECT IDENTIFICATION <br />Task #: 06A State: Colorado <br />Date: 1/13/2012 County: Moffat <br />User: DMC <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Horsepower: 310 <br />Blade Type: Semi - Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $199.86 <br />Total Fleet Cost/Hour: $199.86 <br />MATERIAL QUANTITIES <br />Initial Volume: 4,840 <br />Swell factor: 1.000 <br />Loose volume: 4,840 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Weight description: Top Soil <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />AM1 Spread topsoil <br />$58.56 <br />$102.81 <br />$0.00 <br />$38.49 <br />Task 05a <br />Cat Handbook <br />100 feet <br />852.6 LCY /hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: 0 % <br />Average site altitude: 6,600 feet <br />Material weight: 1,600 lbs/LCY <br />BULLDOZER WORK <br />Permit Action: SI -1 Permit/Job #: M1982141 <br />0.750 <br />1.200 <br />1.000 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />Abbreviation: None <br />Page 1 of 2 <br />Filename M141 -06a <br />CIRCES Cost Estimating Software <br />