My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-17_REVISION - M1982141
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982141
>
2012-01-17_REVISION - M1982141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:25 AM
Creation date
1/25/2012 11:21:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982141
IBM Index Class Name
REVISION
Doc Date
1/17/2012
Doc Name
Notice of Surety Increase
From
DRMS
To
Moffat Limestone Company
Type & Sequence
SI1
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Material up to 1/8" diameter 0.02 <br />0.020 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high or less 0.01 <br />0.010 <br />(Cat HB) <br />Truck Ownership: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />Nominal target 0.00 <br />-0.040 <br />0.000 <br />(Cat HB) <br />(Cat HB) <br />Dump Target: <br />Task description: <br />Site: Juniper Quarry <br />PROJECT IDENTIFICATION <br />Task #: 05A State: Colorado <br />Date: 1/13/2012 County: Moffat <br />User: DMC <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 972H Horsepower: 287 <br />Attachment 1: ROPS Cab Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: $140.73 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />Loader Cycle Time: <br />Haul and Return Time <br />4,840 <br />WHEEL LOADER - LOAD AND CARRY WORK <br />AM1 Distribute topsoil throughout disturbed area <br />4,840 <br />$36.70 <br />$65.54 <br />$38.49 <br />$140.73 <br />CCY <br />LCY <br />Source of estimated volume: 12 ac. disturbance (2011 Annual Report) x 3" <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Haul Route: <br />Return Route: <br />Swell factor: 1.000 <br />Utilization % <br />NA <br />100 <br />NA <br />Unadjusted Basic Cycle Time (load, dump, maneuver): <br />Length <br />(feet) <br />Grade Res. <br />( %) <br />Net Cycle Time Adjustment: <br />Rolling <br />Res. ( %) <br />Total Res. <br />( %) <br />Abbreviation: None <br />-0.010 <br />Adjusted Basic Cycle Time: 0.515 <br />Rolling Resistance — Road Conditions <br />Haul: Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Return: Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />0.525 <br />Travel Time <br />(minutes) <br />Page 1 of 2 <br />Permit Action: SI -1 Permit/Job #: M1982141 <br />Filename M141 -05a <br />minutes <br />minutes <br />minutes <br />200 <br />200 <br />0.00 <br />0.00 <br />4.00 <br />4.00 <br />4.00 <br />4.00 <br />0.1697 <br />0.1561 <br />Source <br />(Cat HB) <br />(Cat HB) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.