Laserfiche WebLink
Oswald, Robert <br />From: Jon Thorson [jonthorson @rmi.net] <br />Sent: Thursday, January 19, 2012 9:54 AM <br />To: Oswald, Robert <br />Subject: Re: Colorado Potash project (P- 2011 -012) <br />Bob <br />The EA is in the draft review stage and supposed to be finished by April 1. However, <br />the BLM just finally got around to telling us what the specific <br />recommendations /requirements will be for all of the drilling details, which they are going <br />to put in the EA as conditions for acceptance. <br />I basically have to go back to the beginning and replan the entire drill hole specifics; <br />hole sizes and depths, casing sizes and requirements, plugging requirements , etc, etc, <br />etc. All of my potential contractors are back to square one as well, and re -bid with <br />different casing, bigger BOP, different methods of handling cuttings (closed loop rather <br />than mud pit). Obviously, both I and RM Potash are not too happy with the BLM telling <br />us, at virtually the last minute, what they will require, when they have had the <br />opportunity to make these decisions at any time since July. <br />I would appreciate your indulgence if you and CDRMS could grant RM Potash another <br />extension for an additional two months. <br />Thank you <br />Jon <br />Jon P. Thorson <br />Manager, Colorado Potash Project <br />RM Potash Inc. <br />5515 Nuthatch Road <br />Parker, Colorado 80134 <br />ionthorson ©rmi.net <br />303 - 805 -2502 <br />Cell 303 - 514 -9160 <br />P� ►� �. " .rw.w 'V- Y) p o T& 51-si 5 E 1 c - \ fl•J r - n tom, c - ns <br />p ti N y 1„/ ' ��.�-� iv i C ta�L <br />1 <br />RECEIVED <br />0;v; ,r, of FZ�, ,, ci: , ;s'natton , <br />' 'tl lif ik S. : <br />V <br />F cz <br />EX � ( D 1 c. <br />o <br />AC Ea v 12E p t.) <br />