Laserfiche WebLink
All values in ac -ft unless noted <br />Depletions <br />Replacements <br />Summertime Replacement (GIC Shares) <br />Remaining Replacement <br />Total <br />Long -term <br />Monthly Net <br />Evaporative <br />Lagged <br />Unit GIC <br />Total Credit for <br />Evap <br />Losses <br />Depletions <br />Credit <br />all Shares <br />Initial Balance <br />Total Additional Credit Required <br />Month <br />[ft] <br />[ac -ft] <br />[ac -ft] <br />[ac -ft /sh] <br />[ac -ft] <br />[ac -ft) <br />[ac -ft] <br />(A) <br />(B) <br />(C) <br />(D) <br />(E) <br />(F) <br />(G) <br />Nov <br />0.10 <br />3.40 <br />8.27 <br />-0.42 <br />-2.92 <br />-11.20 <br />11.20 <br />Dec <br />0.09 <br />3.06 <br />6.77 <br />-0.38 <br />-2.68 <br />- 9.45 <br />9.45 <br />Jan <br />0.08 <br />2.72 <br />5.92 <br />-0.36 <br />-2.49 <br />-8.41 <br />8.41 <br />Feb <br />0.11 <br />3.74 <br />5.53 <br />-0 .33 <br />-2 .33 <br />- 7. 86 <br />7. <br />Mar <br />0.14 <br />4.76 <br />5.6o <br />-0.31 <br />-2.19 <br />-7.78 <br />7.7 <br />Apr <br />0.23 <br />7.82 <br />6.21 <br />-0.10 <br />-0.67 <br />-6.88 <br />6.88 <br />May <br />0.30 <br />10.20 <br />7.39 <br />1.49 <br />10 .45 <br />3.07 <br />0,00 <br />Jun <br />0.44 <br />14.9 <br />9.07 <br />2.37 <br />16.57 <br />7.5o <br />o.00 <br />Jul <br />0.48 <br />16.32 <br />10.97 <br />3.23 <br />22.62 <br />11.65 <br />0 00 <br />Aug <br />0 44 <br />14.96 <br />11.93 <br />2.90 <br />20.27 <br />8.34 <br />0.00 <br />Sep <br />0.31 <br />10.54 <br />11.55 <br />1.84 <br />12 87 <br />1.32 <br />0.00 <br />Oct <br />0,20 <br />6.8o <br />10.07 <br />0.38 <br />2.65 <br />-7.42 <br />7.42 <br />Total <br />2.92 <br />99.28 <br />99.28 <br />10.31 <br />72.16 <br />-27.12 <br />59. <br />Table 1 <br />Augmentation Plan Water Balance (GIC Shares) <br />Loloff Pit (M- 1985 -112) <br />Exposed Area = <br />34 <br />acres <br />No. of GIC Shares = <br />Price per Share = $50,000 <br />Date Revised: 12/23/2011 <br />AG Job #: 07 -154 <br />7 <br />Notes: <br />(A) Monthly Evaporation rates from SWSP approvals. <br />(B) Total Evaporative Loss = (A) x (Current Exposed Area) <br />(C) Long -term Lagged Depletions determined by lagging (B) by an SDF of 6o days <br />(D) Unit GIC Credit obtained from the May 1998 engineering report for the Poudre Prairie decree in Case No. 96CW658 <br />(E) Total Credit for all shares obtained <br />(F) Initial Balance = (E) - (C) <br />(G) Additional replacement credit required whenever the initial balance in (F) is negative <br />