<br />• <br /> <br />TABLE 17-2 <br />Summary of Reclamation Scheduling <br />Action Taken <br />1. Bond procurement <br />2. Sediment control <br />3. Topsoil removal and storage <br />4. Commence operation <br />5. Removal of buildings, rail spur, <br />facilities, etc. <br />6. Backfilling and grading (Phase I bond <br />release is ready for implementation) <br />7. Topsoil redistribution (traffic areas <br />and other compacted areas will be <br />ripped prior to topsoiling) <br />8. Soil testing and amendment application <br />9. Seeding (Phase II bond release is <br />ready for implementation) <br />10. Rill and gully monitoring, repair, <br />maintenance, normal husbandry activities <br />11. Revegetation monitoring <br />12. Revegetation success monitoring <br />13. Phase III bond release is ready for <br />implementation <br />Time Period <br />Prior to permit issuance, or as <br />necessary to support approved changes <br />to the operational plan <br />Previously installed <br />Previously completed; prior to final <br />backfilling and grading <br />June 1993 (approximate) <br />After final cessation of operations <br />(Regulatory Authority to be notified) <br />Concurrent with facility removal <br />After final backfilling and <br />grading is completed <br />Prior to seedbed preparation for <br />phosphorus and after second or <br />third growing season for nitrogen <br />First appropriate planting season <br />after topsoil replacement <br />Years 1 through 8 after last <br />augmented seeding <br />Periodically (years 1 through 8 after <br />last year of augmented seeding <br />Year 9 and 10 after last year of <br />augmented seeding <br />After all reclaimed disturbances have <br />been observed for a minimum of 10 <br />years <br />MR-16 6 Revised 11/07 <br />