Laserfiche WebLink
Exhibit L Reclamation Costs Rule 6.4.12 <br />The Division will calculate the require reclamation warranty based on the total <br />volume figures you provided after the pre- operational inspection was conducted <br />on 12/9/2011 <br />Exhibit M other permits and licenses Rule 6.4.13 <br />Under the Exhibit, the operator listed an APEN 07EL03067 permit. What is an <br />APEN permit? <br />Air Pollutant Emission Notice is required for an emission point with uncontrolled <br />actual emissions. <br />"The source is specifically exempt from permit requirements but does require an <br />APEN as the emissions exceed the APEN thresholds." <br />It is the understanding of the Division all the adjacent land owners have been <br />notified in accordance with the Rule. Please acknowledge. <br />We have notified all adjacent land owners — Donald & Flora Schriner (surface right <br />owner) and Anadarko ( mineral rights owner) by certified mail in accordance with <br />the rule. <br />Sincerely; <br />Robert Tibbetts <br />Mining Supervisor <br />Page 3 <br />