Laserfiche WebLink
F STREET <br />FIELD MEASUREMENTS FROM MONITORING WELLS <br />WELL #4: Total Well Depth - 30' 0 "; PVC Casing Diameter - 2" <br />DATE pH Conductivity Temp. (C) SWL <br />01/04/11 11.2 <br />02/01/11 11.6 <br />03/03/11 12.1 <br />04/05/11 12.4 <br />05/06/11 12.7 <br />06/08/11 10 7 <br />Note: Pits filled with water during June from <br />07/02/11 7.6 of Poudre flooding into pit by Boyd /Fre( <br />Greeley /Boyd- Freeman ditch began de -wa <br />08/01/11 7 order to work on pit slope /ditch repairs fro <br />09/01/11 7.4 <br />10/05/11 9.3 <br />11/10/11 10 <br />12/02/11 10.5 <br />Commencing 2001, temperature & conductivity measurements no longer required (DMG letter <br />dated 5/16/01. pH was never required & therefore also suspended commencing 2001 <br />