Land Status Category
<br />Last Years
<br />Cumulative Total
<br />This Calendar Year
<br />Cumulative Total 1
<br />Acres disturbed
<br />111.2
<br />-0-
<br />111.2
<br />Acres backfilled and graded
<br />91.8
<br />-0-
<br />91.8
<br />Acres topsoiled
<br />91.8
<br />-0-
<br />91.8
<br />Colorado Division of Minerals and Geology
<br />Annual Reclamation Report for the Year 2011
<br />Hamilton Mine
<br />mine name
<br />C- 1991 -078
<br />permit #
<br />Address: 2352 North 7th Street, Unit B, Grand Junction, CO 81501
<br />Honeywood Coal Company
<br />Permittee
<br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon
<br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other
<br />reclamation monitoring data as required by the approved permit. The location of the acreage reported
<br />under each land status category and year of seeding (if applicable) should be clearly and accurately
<br />identified on a map included with the report.
<br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for
<br />each category below. Do not include acres that have achieved final, Phase III release.
<br />*include, if necessary, a description of any augmented seeding or culture practices
<br />The mine was seeded in 1993, 1995 and 1998. For puposes of "Greater thanl0 years" the 1998 date was used.
<br />For the Entire Life of Mine, the total number of acres disturbed 111.2 and the total number of acres:
<br />Phase I released 90.2
<br />Phase II released 90
<br />For Mines in Permanent Cessation:
<br />Total acreage in facilities subject to reclamation but yet to be completed -0-
<br />For Government Performance and Results Act
<br />Acreage in long -term mining or reclamation facilities 2 19.4
<br />Acreage in active mining areas 3 -0-
<br />'(exclude acres where Phase III release has been achieved)
<br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and
<br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas;
<br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and
<br />coal mine waste impoundments; head -of- hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area
<br />(garbage dumps and coal combustion by- products disposal areas).
<br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded
<br />Phase III released -0-
<br />Last Years
<br />Cumulative
<br />Total
<br />This Calendar
<br />year
<br />Cumulative
<br />Total'
<br />10 years or
<br />less
<br />Greater than
<br />10 years'
<br />Acres seeded*
<br />91.8
<br />-0-
<br />91.8
<br />0.0
<br />90.2
<br />Colorado Division of Minerals and Geology
<br />Annual Reclamation Report for the Year 2011
<br />Hamilton Mine
<br />mine name
<br />C- 1991 -078
<br />permit #
<br />Address: 2352 North 7th Street, Unit B, Grand Junction, CO 81501
<br />Honeywood Coal Company
<br />Permittee
<br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon
<br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other
<br />reclamation monitoring data as required by the approved permit. The location of the acreage reported
<br />under each land status category and year of seeding (if applicable) should be clearly and accurately
<br />identified on a map included with the report.
<br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for
<br />each category below. Do not include acres that have achieved final, Phase III release.
<br />*include, if necessary, a description of any augmented seeding or culture practices
<br />The mine was seeded in 1993, 1995 and 1998. For puposes of "Greater thanl0 years" the 1998 date was used.
<br />For the Entire Life of Mine, the total number of acres disturbed 111.2 and the total number of acres:
<br />Phase I released 90.2
<br />Phase II released 90
<br />For Mines in Permanent Cessation:
<br />Total acreage in facilities subject to reclamation but yet to be completed -0-
<br />For Government Performance and Results Act
<br />Acreage in long -term mining or reclamation facilities 2 19.4
<br />Acreage in active mining areas 3 -0-
<br />'(exclude acres where Phase III release has been achieved)
<br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and
<br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas;
<br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and
<br />coal mine waste impoundments; head -of- hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area
<br />(garbage dumps and coal combustion by- products disposal areas).
<br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded
<br />Phase III released -0-
<br />
|