Laserfiche WebLink
-4- <br />12. Primary future (Post - mining) land use (c heck one <br />Cropland(CR) _ Pastureland(PL) <br />X Rangeland(RL) Forestry(FR) <br />Residential(RS) _ Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />X Wildlife Habitat(WL) <br />_ Industrial /Commercial(IC) <br />Solid Waste Disposal(WD) <br />13. Primary present land u se (check one <br />Cropland(CR) Pastureland(PL) <br />-L— Rangeland(RL) _ Forestry(FR) <br />Residential(RS) _ Recreabon(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />X Wildlife Habitat(WL) <br />Industri al/Cornmercial(IC) <br />14. Method of Mining Briefly explain mining method (e.g.truck/shovel): Loader Digging From Face to Feed <br />Crusher or Load Trucks <br />15. On Site Processing X Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): Same As Above <br />List any designated chemicals or acid- producing materials to be used or stored within permit area: No ne <br />16. Description of Amendment or Conversion <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Adding a 4.6 Acre Stockpile Site and Changing North Cut Slope <br />to 2:1 Slope to correct slope failure. <br />