(e) It is difficult to arrive at a schedule for this site because of annual productions. The south <br />and southeast section benches will be covered as soon as they are constructed while mining is <br />taking place. <br />(1) In the south and southeast sections all benches will be constructed from the top of cut <br />down. In this area it will take from 1 to 2 days per bench to final grade and place reclaim <br />material. On the north wall each face and bench will take approximately 5 days to complete <br />grading and place schist material. <br />2 (E) (1) The pit floor will be sloped on a 10:1 slope to the southeast corner to be utilized as a <br />sediment pond as shown on map <br />2 (E) (II) All areas shown on map. <br />South face approximately 1.5 acres <br />Southeast wall section approximately 2 acres <br />North wall section approximately 15 acres <br />Pit floor area approximately 6 acres <br />2 (E) (III) South wall will be reclaimed first. Southeast wall will be done second, as will advances <br />north. It will be reclaimed as needed. North wall will be completed as each face and bench <br />section is built. Pit floor will be final state of reclamation. <br />2 (F) (1) South wall vertical wall with benches. Southeast section 1:1 slope with 20' benches to <br />create 1.5:1 slope. <br />East wall 2:1 slope <br />North wall 2:1 slope with 20' benches <br />Pit floor 10:1 slope <br />2 (F) (II) See NRCS report. <br />2 (F) (III) See NRCS report. <br />2 (F) (IV) See NRCS report. <br />2 (F) (V) As noted there is virtually no topsoil at this site. <br />9 <br />