Laserfiche WebLink
EXHIBIT L- Reclamation Costs <br />a) Southeast and south walls: benches will be constructed as mining progresses. <br />Placement of material will take place in phases of completion. Placement and <br />spreading of schist type material on benches as follows: <br />Per Bench Cost <br />Cat950 Loader to wheel material 6 hrs x $125/Hr= $750.00 <br />Cat D6 Dozer to grade material 4 hrs x $150 /Hr= $600.00 <br />$1350.00 <br />$1350.00 /Bench x 5 <br />$6750.00 <br />b) North and northeast pit walls: slopes will be constructed to final slopes in the <br />mining process as well as benches. Placement and spreading on slope and bench as <br />follows: <br />Per Slope and Bench Cost <br />Cat 950 Loader 14 hrs x $125 /Hr= $1750.00 <br />Cat D6 Dozer spreading and final grading slopes and bench <br />10 hrs x $150 /Hr= $1500.00 <br />$3250.00 <br />$3250.00 /Bench x 3 $9750.00 <br />Pit Floor -Final Grading <br />Cat D6 Dozer 8 hrs x $150 /Hr= $1200.00 <br />As reclamation will be on going throughout the mining process, reclamation costs <br />will be spread out over the life of mine with the <br />20 <br />