Laserfiche WebLink
New Elk Coal Company 1/19/2012 <br />Reclamation Bond Estimate <br />NOI -X- 2011- 232 -01 <br />Amendment No. 3 <br />Seat /na Expense <br />Drill Pad Reclamation <br />Hole Variables <br />Pad Variables <br />Number of Holes to be Sealed <br />16 <br />Holes <br />Length <br />100 <br />Feet <br />Miles of Road to be Reclaimed <br />- <br />Miles <br />Width <br />100 <br />Feet <br />Rotary Hole Diameter <br />6.000 <br />Inches <br />Acres /Pad <br />0.23 <br />Acres <br />Rotary Footage <br />13,322 <br />Feet <br />Total Acres <br />3.67 <br />Acres <br />Cubic Foot of Hole per Sack of Cement <br />2 <br />CF <br />Regrading <br />Equipment Hours per Pad includes Mud Pit <br />Equipment Cost per Hour <br />4 <br />$ 90.00 <br />Hours <br />Sealing Materials - Variables <br />Cement per Sack <br />$ 10.65 <br />Plugs <br />$ 176.88 <br />Equipment Cost per Pad <br />$ 360.00 <br />Hole Markers <br />$ 3.72 <br />Total Regrading Cost <br />$ 5,760.00 <br />Sealing Materials - Volumes <br />Reseeding <br />Cement in Sacks <br />1,308 <br />Each <br />Seeding & Mulching Cost Per Acre <br />$ 252.00 <br />Plugs <br />N/A <br />Each <br />Acres to Reseed <br />3.67 <br />Hole Markers <br />16 <br />Each <br />Total Reseeding Cost <br />$ 925.62 <br />Rig Expense <br />Rig Time to Pull Casing <br />2 <br />Total Drill Pad Reclamation <br />$ 6,685.62 <br />Rig Time to Seal Hole <br />6 <br />Hours <br />Rig Time per hour Cost <br />$ 152.20 <br />Total Cost, Sealing Rig Cost <br />$ 19,482 <br />Water Cost <br />Hours per Hole <br />8 <br />Hours <br />Cost per Hour for Water Truck and Driver <br />$ 56.40 <br />Total Water Cost <br />$ 7,219.20 <br />Sealing Materials - Expense <br />Cement in Sacks <br />$ 13,929.00 <br />Plugs <br />N/A <br />Hole Markers <br />$ 59.52 <br />Total Cost Sealing Materials <br />$ 13,988.52 <br />Total Sealing Expense <br />$ 40,689 <br />Direct Reclamation Cost <br />$ 47,375 <br />Job Superintendent (75 hrs nn, $58.56) <br />$ 4,392 <br />Profit, Insurance, Bond 13.07% <br />$ 6,192 <br />Subtotal (contract amount) <br />$ 57,959 <br />Engineering aA4.25% <br />$ 2,463 <br />Reclamtion Management (aZ5% <br />$ 2,898 <br />Total Reclamation Cost <br />$ 63,320 <br />0.1307 <br />0 0425 <br />0.05 <br />