Laserfiche WebLink
STORMWATER ANNUAL REPORT - SAND AND GRAVEL <br />COLORADO DEPT. OF PUBLIC HEALTH & ENVIRONMENT <br />Water Quality Control Division <br />WQCD -P -B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80246 -1530 <br />Make enough copies of form for each reporting year. Or go to <br />http: / /www. cdphe.state.co. us /wq /PermitsUnit /stormwater /industrial.html <br />Permittee (Company Name): Rio Grande Company <br />Facility Name: S-4 Sand Pit <br />Mailing Address: P.O. Box 17227 Denver, Colorado 80217 <br />Facility Phone Number: 303 - 210 - 9603 <br />Reporting Period: Jan. 1 -Dec. 31, 20 Jāœ“(_ (Form is due by Feb. 15 of the following year) <br />* *Each section must be completed. Please print or type. ** <br />Note - form may be reproduced <br />Page 1 of 2 <br />Check if this is a <br />new name, address, etc. <br />ā‘ <br />Permit Certification No. COR -34 _ _ _ _ - OR - COG -50 0374 <br />(stormwater certification only) (stormwater and process water combined certification) <br />IMO iv not a valid entry for the certification number <br />ā‘ <br />A. A report on the facility's overall compliance with the SWMP. (Include here a summary of any measures taken <br />to comply with your Stormwater Management Plan (SWMP), to fully implement it, changes or improvements <br />made in any of your Best Management Practices (BMPs), employee training, spills, other problems <br />encountered, etc. How is your plan working ?) <br />See attached Compliance Inspection response letter dated July 11, 2011 <br />g <br />C: ( egl )t 1 ! 5 C-op <br />Were changes made to your SWMP? El Yes - Describe changes on a separate sheet. <br />B. A summary of each comprehensive stormwater facility inspection made, including date, findings. and action <br />taken. (The permit requires at least two comprehensive facility inspections per year - see page 8 of the permit. <br />Include here a summary of those inspections, plus any other comprehensive inspections made. It is not <br />necessary to summarize day -to -day inspections, unless significant problems were noted.) <br />First Inspection - Date . 2 1 . Findings, and action taken: <br />See attached WQCD Compliance Inspection Letter Dated July 5, 2011 including Stormwater <br />Management Site Plan <br />G;;tj <br />'f <br />ar1 /1lsg <br />