My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-04_REVISION - M1997065
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997065
>
2012-01-04_REVISION - M1997065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:25:35 PM
Creation date
1/19/2012 10:00:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997065
IBM Index Class Name
REVISION
Doc Date
1/4/2012
Doc Name
Cost Summary
From
DRMS
To
File
Type & Sequence
AM1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 <br />1500.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />0.692 <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(f1 m) <br />Travel <br />(min) <br />1 <br />1500.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />0.557 <br />Truck/Loader Worksheet Cont'd <br />Haul Route: <br />Return Route: <br />Task # 002 <br />Haul Time: <br />Return Time: <br />0.692 <br />0.557 <br />Total Truck Cycle Time: 4.429 <br />minutes <br />minutes <br />minutes <br />Page 3 of 3 <br />Loading Tool unit <br />Production 442.11 LCY /Hour Adjusted for job efficiency: 366.95 LCY /Hour <br />Truck Unit Production <br />227.59 LCY /Hour Adjusted for job efficiency: 188.90 LCY /Hour <br />Optimal No. of Trucks: 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br />Adjusted hourly truck team production: 377.80 LCY /Hour <br />Adjusted single truck/loader team production: 366.95 LCY /Hour <br />Adjusted multiple truck/loader team production: 733.89 LCY /Hour <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) Total job time: 130.71 Hours <br />Unit cost: $1.166 /LCY Total job cost: $111,832.56 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.