My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-04_REVISION - M1997065
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997065
>
2012-01-04_REVISION - M1997065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:25:35 PM
Creation date
1/19/2012 10:00:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997065
IBM Index Class Name
REVISION
Doc Date
1/4/2012
Doc Name
Cost Summary
From
DRMS
To
File
Type & Sequence
AM1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK/LOADER TEAM WORK <br />Task description: Haul Upper Overburden Pile Into Pit & Grade <br />Site: Brownstone Quarry <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 1/3/2012 County: Larimer <br />User: MAC <br />Cost Breakdown: <br />Permit Action: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: <br />- Loader: <br />Support Equipment -Load Area: <br />-Dum • Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Truck/Loader Team <br />Total work team cost/hour: $855.59 <br />MATERIAL QUANTITIES <br />Initial volume: 95,926 CCY <br />AMO1 Bond <br />Calculation <br />Equipment Description <br />Generic 12 -18 cy, 6x4 <br />CAT 963C <br />NA <br />Cat D8T - 8SU <br />NA <br />Water Tanker, 2,500 Gal. <br />Support Equipment <br />Page 1 of 3 <br />Permit/Job #: M 1997065 <br />Abbreviation: None <br />Filename: M065 -002 <br />Shift basis: 1 per day <br />Maintenance Eauipment <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 Pounds /LCY <br />Description: Decomposed rock - 50% Rock, 50% Earth <br />Rated Payload: 50,300 Pounds <br />Payload Capacity: 17.34 LCY <br />Swell factor: 1.000 <br />Loose volume: 95,926 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />Truck <br />Track Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />I Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />50 <br />NA <br />50 <br />Ownership cost /hour: <br />$14.78 <br />$28.15 <br />NA <br />$58.56 <br />NA <br />$7.69 <br />Operating cost/hour: <br />$68.39 <br />$58.96 <br />NA <br />$54.58 <br />NA <br />$11.55 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />$0.00 <br />Operator cost/hour: <br />$25.19 <br />$38.54 <br />NA <br />$38.49 <br />NA <br />$0.00 <br />Unit Subtotals: <br />$108.36 <br />$125.64 <br />NA <br />$151.63 <br />NA <br />$19.24 <br />Number of Units: <br />4 <br />2 <br />0 <br />1 <br />0 <br />1 <br />Group Subtotals: <br />Work: $684.72 <br />Support: $151.63 <br />Maint: $19.24 <br />TRUCK/LOADER TEAM WORK <br />Task description: Haul Upper Overburden Pile Into Pit & Grade <br />Site: Brownstone Quarry <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 1/3/2012 County: Larimer <br />User: MAC <br />Cost Breakdown: <br />Permit Action: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: <br />- Loader: <br />Support Equipment -Load Area: <br />-Dum • Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Truck/Loader Team <br />Total work team cost/hour: $855.59 <br />MATERIAL QUANTITIES <br />Initial volume: 95,926 CCY <br />AMO1 Bond <br />Calculation <br />Equipment Description <br />Generic 12 -18 cy, 6x4 <br />CAT 963C <br />NA <br />Cat D8T - 8SU <br />NA <br />Water Tanker, 2,500 Gal. <br />Support Equipment <br />Page 1 of 3 <br />Permit/Job #: M 1997065 <br />Abbreviation: None <br />Filename: M065 -002 <br />Shift basis: 1 per day <br />Maintenance Eauipment <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 Pounds /LCY <br />Description: Decomposed rock - 50% Rock, 50% Earth <br />Rated Payload: 50,300 Pounds <br />Payload Capacity: 17.34 LCY <br />Swell factor: 1.000 <br />Loose volume: 95,926 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.