Laserfiche WebLink
Non - Roadable <br />Equipment <br />Roadable <br />Equi ment <br />0.44 <br />0.44 <br />0.44 <br />0.44 <br />2.00 <br />NA <br />2.00 <br />NA <br />4.89 <br />0.89 <br />Mobilization Worksheet Cont'd <br />Task # 008 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: FORT COLLINS <br />Total one -way travel distance: 20.00 miles <br />Average Travel Speed: 45.00 mph <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Total Non - Roadable Mob /Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob /Demob Cost ** <br />** one round trip, no haul rig: <br />Total job time: <br />$7,848.12 <br />$455.27 <br />Total job cost' $8,303.39 <br />9.78 Hours <br />CIRCES Cost Estimating Software <br />