My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-04_REVISION - M1997065
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997065
>
2012-01-04_REVISION - M1997065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:25:35 PM
Creation date
1/19/2012 10:00:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997065
IBM Index Class Name
REVISION
Doc Date
1/4/2012
Doc Name
Cost Summary
From
DRMS
To
File
Type & Sequence
AM1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip Stockpile Areas/Haul Road <br />Site: Brownstone Quarry <br />PROJECT IDENTIFICATION <br />Task #: 006 State: Colorado <br />Date: 1/4/2012 County: Larimer <br />User: MAC <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Ripper Attachment: <br />Cost Breakdown: <br />Cat D8T - 8SU <br />3 -Shank Ripper <br />Ownership Cost /Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost /Hour: <br />Source of estimated quantity: DRMS Estimate <br />HOURLY PRODUCTION <br />Seismic: <br />Area: <br />Seismic Velocity: <br />Average Ripping Depth: <br />Average Ripping Width: <br />Average Ripping Length: <br />Average Dozer Speed: <br />Average Maneuver Time: <br />Production per unit area: <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />JOB TIME AND COST <br />Fleet size: 2 Ripper(s) <br />Unit cost: $446.480 Per acre <br />Permit Action: AMO1 Bond <br />Calculation Permit/Job #: M1997065 <br />$65.28 <br />$109.17 <br />$7.91 <br />$38.49 <br />$220.85 <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Total Fleet Cost /Hour: $441.70 <br />MATERIAL QUANTITIES Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA BCY NA <br />Area: 3 acres Rip Depth (ft): 3.00 Volume: 14,520 BCY or CCY <br />NA feet /second <br />2.56 mph <br />7.08 degrees <br />50.00 feet <br />88.00 feet <br />0.25 feet <br />0.596 acres/hour <br />0.596 Acres/hr <br />Site Altitude: 5,400 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift /day) <br />Net Correction: 0.83 multiplier <br />Adjusted Hourly Unit Production: 0.49 Acres/hr <br />Adjusted Hourly Fleet Production: 0.99 Acres /hr <br />Total job time: <br />Abbreviation: None <br />Total job cost: $1,339.00 <br />Filename: M065 -006 <br />3.03 Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.