My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-29_PERMIT FILE - C1981012A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2011-12-29_PERMIT FILE - C1981012A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:46:33 PM
Creation date
1/18/2012 9:52:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
12/29/2011
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and Roads —West Portal and Map 21— Non -Coal Waste Disposal Area). As per Division <br />request, the Applicant plugged and abandoned the cased well in the area of the non -coal <br />waste disposal site. In addition, the east -west drainage on the north side of the dump will <br />be maintained rather than filled in as shown on Map 14— Sediment and Surface Water <br />Control Plan —West Portal. Maintaining this drainage will allow flow on the north side <br />of the dump into the eastern most evaporation pond. Other waste material such as <br />machinery, scrap iron, equipment, which has some salvage value, is placed in the scrap <br />storage area shown on Map 12— Surface Facilities and Roads —West Portal. The non - <br />coal waste disposal area will be routinely compacted and covered to prevent combustion <br />and airborne wastes. The Applicant will place a maximum of 2 ft of soil or underground <br />development waste over the dump. The Applicant understands the area must be <br />vegetated to meet the standards of Rule 4.15.8. In addition, operation of the dump will <br />meet state, federal and county standards. <br />Petroleum products which are used in the normal mining operation will be <br />collected and recycled where possible. Where recycling of the petroleum products is not <br />possible, they will be sold to local petroleum dealers as waste oil. The Applicant will <br />also dispose of all hazardous materials according to all state and federal regulations. <br />Refuse Disposal Area <br />The refuse disposal area was permitted and construction began in 1984. Both the <br />RDA and Development Waste Pile have been undermined as shown on Map 3 —Mine <br />Plan and Map 22 —Mine Progress. No vertical or differential displacement was observed <br />as a result of subsidence. Old Allen Mine workings range from 320 to 900 ft below the <br />RDA. The area was partially undermined about 1963 by room - and - pillar methods. <br />Extraction percentages within the area are estimated at less than 50 %. It is believed that <br />the limited extraction has retarded subsidence and that the 35+ years that has elapsed <br />since mining is sufficient time for any adverse effects to become evident. As a result, no <br />adverse effects of underground mining on stability of the waste piles are anticipated. <br />The refuse disposal area has a design capacity of approximately 12.7 million <br />cubic yards. This should be sufficient capacity to continue operations for approximately <br />10 years of operation. The refuse belt extends to an elevation of approximately 7,610 ft, <br />as shown on Map 24— Refuse Area. Two RDA extensions are necessary to reach the full <br />storage volume of the RDA. In 2011, a 200 -ft -long 36- inch -wide rigid conveyor was <br />installed at the end of the existing refuse conveyor to bring the belt up to an elevation of <br />7,645 ft. The conveyor was placed in an 80 -ft -long 10 -ft- diameter steel tube, where it <br />crosses over the east perimeter rip -rap ditch, to eliminate the accumulation of belt dribble <br />in the rip -rap channel. Two 150 -ft -long radial stackers and a 500 -ft -long portable belt are <br />used in series to spread the refuse over wide areas on the active bench. An extension on <br />the primary belt will be added from the 7,550 -ft elevation up to the 7,750 -ft elevation. <br />Refuse will be stockpiled at this location until it is hauled to the active bench for final <br />deposition. The pile will consist of a maximum of 30,000 tons. The daily working pile <br />quantity will vary from the maximum capacity to zero. The grade of the conveyor is <br />approximately 14 degrees which corresponds to 25 %. <br />TR -59 2.05 -27 Revised 08/11/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.