My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-29_PERMIT FILE - C1981012A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2011-12-29_PERMIT FILE - C1981012A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:46:33 PM
Creation date
1/18/2012 9:52:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
12/29/2011
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
feet (the elevation of the bottom of the airshaft and slope entries) allowing entry into and <br />• exploration of the mine. Initial pumping capacity is planned at 4,000 gpm. Location of <br />the pumping system is shown on Map 11 - Surface Facilities and Roads East Portal. <br />At this rate dewatering may take from 6 -9 months dependent on actual quantities of <br />water encountered. After dewatering to 7162' elevation, pumping will continue to occur <br />from pumps located underground and the temporary system will be removed. <br />Prior to mine closure, mine water quality allowed discharge directly into the Purgatoire <br />River with no treatment. Since closure, mine water samples have been periodically <br />extracted from the East Portal airshaft and a borehole into the mine workings (NEW -2 <br />and NEW-4 of the hydrologic monitoring plan). Sample results collected at these sites <br />indicate that direct discharge can be resumed in compliance with NPDES permit <br />limitations. Additional samples will be collected at the pumphead and analyzed for the <br />parameters listed in the NPDES permit renewal application, page 10 items 26 and 28 <br />(Exhibit 22 of the New Elk permit). No discharge to the Purgatoire River will occur <br />until confirmation of satisfactory test results. <br />NECC has submitted an application to modify the NPDES permit to allow diverting the <br />mine water though a treatment pond prior to discharge into the Purgatoire River. Pond <br />001 will be constructed for this purpose. Figure 5 provides design criteria and proposed <br />cross - sections for pond 001. The location of pond 001 is shown on Map 13 Sediment <br />• and Surface Water Control Plan — East Portal. Coal processing waste (from <br />sediment pond clean-out) and remnant coal stockpile debris will be removed from the <br />pond site and disposed of at the Development Waste Pile prior to pond construction. <br />This material will not be used in pond embankment construction. <br />Pond 001 will continue to receive mine water once mining operations are resumed. <br />Future water production is expected to range from 125 to 300 gpm, but is dependent on <br />mine production and conditions encountered. Mine water will be retained in the pond <br />only as necessary for compliance with NPDES permit limitations. Any excess pond <br />capacity may be used for water storage to supplement mining and preparation plant <br />operations only to the extent allowed by water rights leased by NECC. <br />(5) Topsoil <br />A majority of the disturbance at the New Elk Mine occurred prior to existing regulations <br />on salvaging topsoil. As such, only a limited amount is available for reclamation. The <br />exception to this is the refuse <br />TR-49 2.05 -19 (Revised 02- 15 -07) <br />
The URL can be used to link to this page
Your browser does not support the video tag.