Laserfiche WebLink
New Elk Coal Company <br />Permit C- 1981 -012 <br />TR 59 NOV and RDA Conveyor Extension <br />TR -59 addresses the abatement steps for notice of violation CV- 2011 -003 which was <br />issued to New Elk Coal Company because areas in the vicinity of the "C &W Train Shop ", the <br />"10 Stall Garage" and the "C &W Trains Sand Loading Building" (Map 11 -Sheet 3) where mine <br />equipment has been laid down and/or stored are outside the approved disturbed area boundary <br />and in some places outside the approved permit boundary. <br />This document estimates the bonding required to reclaim the "C &W Train Shop ", the "10 <br />Stall Garage" and the "C &W Trains Sand Loading Building" and other associated facilities. The <br />location of the facilities are shown on Map 11 Sheet 3 New Elk Mine Site Plan, East Portal <br />Facilities. <br />This document incorporates the DRMS reclamation estimate to reclaim the facilities. <br />The following pages detail the cost estimate. In summary, the estimate is: <br />Total direct cost <br />$ 93,825.70 <br />Job supervision cost <br />$ 3,504.82 <br />Profit, insurance, bond <br />$12,263.02 <br />Contract <br />$109,593.54 <br />Engineering <br />$4,657.73 <br />Reclamation management <br />$ 5,479.68 <br />Estimated bond <br />$119,730.94 <br />TR -59 Exhibit 28- Page 201 Revised 12/12/11 <br />