Laserfiche WebLink
Site Plan Area: Backfi ing Transfornier and Rock Dust Bin Area <br />:7 <br />.7 <br />Ti? S/1 Rvh;h ;t 7Q l n'o 1 SZ Rvv ;oarl 17110_7010 <br />Loading and <br />Topsoil I.oadng <br />Item <br />Hauling <br />Regrading <br />and Haulage <br />Topsoil Regrading <br />Reseeding <br />Length (ft) <br />Width (ft) <br />Depth/height (ft) <br />Quantity <br />17,500 <br />17,500 <br />1573 <br />1573 <br />1.30 <br />Units <br />CY <br />CY <br />CY <br />CY <br />Acres <br />Unit cost <br />$1.03 <br />$0.84 <br />$1.03 <br />$0.67 <br />$1,550.14 <br />Total direct cost <br />$18,043 <br />$14,770 <br />$1,622 <br />$1,057 <br />$2,015 <br />Job supervision hours <br />8 <br />52 <br />8 <br />8 <br />8 <br />Job supervision cost <br />$333 <br />$2,167 <br />$333 <br />$333 <br />$333 <br />Profit, insurance, and bond <br />$2,358 <br />$1,930 <br />$212 <br />$138 <br />$263 <br />Contract <br />$20,734 <br />$18,868 <br />$2,167 <br />$1,529 <br />$2,612 <br />Engineering <br />$881 <br />$802 <br />$92 <br />$65 <br />$111 <br />Reclamation management <br />$1,037 <br />$943 <br />$108 <br />$76 <br />$131 <br />Estimated bond <br />$22,652 <br />$20,613 <br />$2,368 <br />$1,670 <br />$2,854 <br />:7 <br />.7 <br />Ti? S/1 Rvh;h ;t 7Q l n'o 1 SZ Rvv ;oarl 17110_7010 <br />