My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-13_HYDROLOGY - C1994082 (2)
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1994082
>
2012-01-13_HYDROLOGY - C1994082 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:27 PM
Creation date
1/13/2012 2:04:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
HYDROLOGY
Doc Date
1/13/2012
Doc Name
4th Quarter 2011 Sedimentation Pond Inspection
From
Seneca Coal Company
To
DRMS
Permit Index Doc Type
Sediment Pond Inspections
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTOR'S NAME: Dennis Jones <br />NPDES I.D. NO.: CO- 0000221 D.P. 011 <br />FACILITY CONFIGURATION: Cross - Valley Pond <br />SITE NAME: Pond #011 <br />MINE NAME: Yoast Mine(Seneca Coal Co) <br />MINE I.D. NO.: CMLRD Permit No. C -94 -082 <br />PERIODIC INSPECTION FORM <br />Water, Sediment, or Slurry Impoundments <br />Circle or write in appropriate response <br />DATE: ltiV L )O_2 I - II <br />DATE LAST INSPECTION: ( ! -- I( <br />LOCATION: NE'% SW'/,, Sec. 16, T5N, R87W <br />LOCATION: 8.5 mi. SE of Hayden, CO <br />OWNER'S REP.: Roy Karo, Gen Mgr <br />1. Foundation preparation (removal of vegetation, stumps, topsoil: Yes <br />2. Lift thickness: 8 in. <br />3. Compaction according to approved plan: Yes <br />4. Burning (specify extent and location): No <br />5. Angle of slope: 3.0:1 upstream, 2.8:1 downstream Total = 5.8:1 <br />6. *Seepage (specify location, color, and approximate volume) <br />From underdrain pipes: Yes No N/A <br />At isolated points on embankment slopes: Yes No N/A <br />At natural hillside: Yes No N/A <br />Over widespread areas: Yes No N/A <br />From downstream foundation area: Yes No N/A <br />"Boils" beneath stream or ponded water: Yes No N/A <br />7. Cracks or scarps on crest: Yes No N/A <br />8. Cracks or scarps on slope: Yes No N/A <br />9. Sloughing or bulging on slope: Yes No N/A <br />10. *Major erosion problems: Yes No N/A <br />11. Surface movements in valley bottom or on hillside: Yes No N/A <br />12. *Erosion of toe: Yes No N/A <br />13. *Water impounded against toe: Yes No N/A <br />14. Existing embankment fyeeboard: (normal = 5.1') feet <br />15. Increase V Decrease in water level: 6 feet <br />16. Cracks, bulging, or erosion on upstream face: Yes 00 N/A <br />17. Visible sumps or sinkholes in slurry surface: N/A <br />18. *Clogging <br />Spillway channels and pipes: <br />Decant system: <br />Diversion ditches: <br />19. *Cracking or crushing of pipes <br />Spillway pipes: Yes N/A <br />Decant system: N/A <br />20. Trash racks clear and in place: No N/A <br />21. Discharge rate (gpm) v <br />Yes Nc N/A <br />N/A <br />N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in tin the space on the back of / this sheet. to <br />p 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.