My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-09_PERMIT FILE - C1981035A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035A
>
2012-01-09_PERMIT FILE - C1981035A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:18 PM
Creation date
1/13/2012 1:16:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
1/9/2012
Doc Name
land use
Section_Exhibit Name
KII Appendix 02 Licenses and Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PA2TI <br />Page No. 5 <br />Pcrtnit No. COG-850000 <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />1. Effluent Limitations ___ <br />b. Post-Mining Outfalls <br />Post-mining limitations may apply to outfalls serving surface areas, which have been returned to the required contour and on which <br />revegetation (specifically, seeding or planting) work has commenced. The permittee may request consideration for change from <br />active mining limitations to post-mining limitations when these conditions have been met. <br />POST-MINING PRIMARY LIMITATIONS <br />POST-MINING ALTERNATE LIMITATIONS <br />• <br />Any discharge or increase in the volume of a discharge caused by precipitation wiihin any 24-hour period);reater than the 10-year, <br />24-hour orecinitation even[ (or snowmelt of equivalent volume) maV comply with the following limitations -- subject to burden of <br />proof requirements described in Part I.B.I.d). <br />..a *- ~.~ ;~_`.~.;..... _.'~+>,Pazameter . ~ _`. k '-". ,-,:.:t==tr?` x `'. ``-E~;, _,,~.tmrtahon , -:,?~ ~. ;-.. <br />Plow, MGD Report <br />*Settleable Solids, tnUl Report <br />pH, s.u. 6.5-9.0 <br />Oil and Grease, mg/1 10 <br />Total Dissolved Solids, mg/1*' Report <br />Total Phosphonts (as P), mg/1""" - ~ Report - ~ ~ - <br />'Ifdischarge is to land, T$$ and settleable solids monitoring is waved. '"Applies only to drainages within the Colorado River Basin <br />^'"Applies only to drainages directly above Chatfield Reservoir, Cherry Creek Resmoir, Dillon Reservoiq or Upper Bear Creek <br />c. General Limitations -Active and Post-Mining Outfalls <br />1) There shall be no discharge of sanitary wastewaters from toIlets or related facilities. <br />2) There shall be no discharge of floating solids or visible foam in other than pace amounts. <br />3) There shall be no land application of wastewater other than for dust control. <br />4) No chemicals shall be added to the discharge unless the Division grants specific approval <br />d. Btnden of Proof Requirements <br />The pemilttee has the burden of proof when requesting relief from total suspended solids (TSS), total iron, total manganese, and/or <br />settleable solids limitations. Relief shall be granted only when necessary and shall not be granted when the pemtittee has control <br />over the discharge. The pemrittee should endeavor to meet the primary limitafions wheneverpossible. The Divisionshall have final <br />authority in determining whether relief is granted. <br />1) For rainfall. to waive TSS, total iron, and total manganese limitations, it is necessary to demonstrate that dischazge occurred <br />within 48 hours afrer measurable precipitation has stopped. To waive settleable solids limitations, it is necessary to prove that <br />dischazge occurred within 48 hours afrer precipitation greater than the 10-yeaz, 24-hour event bas stopped. <br />2) For snowmelt, to waive TSS, total iron, and total manganese limitations, it is necessary to demonstrate that discharge occurred <br />within 48 hours after pond inflow has stopped. To waive settleable solids limitations, it is necessary to prove that discharge <br />occurred within 48 hours aRer pond inflow volume greater than the 10-yeaz, 24-hour event has stopped. <br />The Division shall deteanine the adequacy ofproof. As part of tlris deterntinatioty the Division shall evaluate whetherthe permitte< <br />• could have controlled the discharge in such a manner that primary limitations could have been met. All manual dewatering ofpon, <br />that are equipped with automatic dewatering systems must meet TSS, total iron, and fetal manganese limitations. If a pond has otily <br />manual dewatering capability, relief is available only to the extent required to regain necessary stability and capacity. <br />See Part LC. for Definitions <br />
The URL can be used to link to this page
Your browser does not support the video tag.