Laserfiche WebLink
• <br />~J <br />• <br />i <br />2.05.4(2)(b) <br />Following is an estimate of the cost to reclaim the <br />mine at the time, during the five year permit term, when it is <br />believed the reclamation liability is the greatest. <br />Spoil and Topsoil <br />Topsoil Stockpile 3 <br />Topsoil Stockpile 4 <br />Spoil Ridges <br />Subtotal <br />Reclaim Sediment Pond: <br />Reclaim Haul Road: <br />4,500 ft. <br />Seed & Mulch 10 Acres: <br />10 Acres <br />Failure Rate 508 <br />Fence: <br />5,000 <br />Unit Price <br />Total <br />27,000 0.42 <br />-0- N/A <br />75,000 0.14 <br />5,400/LS <br />525/acre <br />1.50/ft. <br />Mobilization & Demobilization - Allow <br />Subtotal Reclamation Cost Estimate <br />Public Liability Insurance - 1.558 <br />Contractors Performance Bond - 0.9758 <br />Job Superintendent - 200 Hrs. @ $25.00 <br />Contractor's Profit - 108 <br />Subtotal <br />Engineering/Bid Documents 4.258 $64,206 <br />CMLRD Project Management 100 Hrs. @ $20 <br />Subtotal <br />Total Reclamation Bond Amount - Area 3 <br />$ 11,340 <br />0 <br />10.500 <br />21,840 <br />0 <br />5,400 <br />5,250 <br />2,625 <br />7,500 <br />10.000 <br />$ 52,615 <br />816 <br />513 <br />5,000 <br />5,262 <br />$ 11,591 <br />2,729 <br />2.000 <br />4,729 <br />$ 68,935 <br />Currently the mine is bonded for the worst case scenario <br />expected for mining Area 1 and 2 concurrently. Mining in Area 1 <br />and Area 3 sequentially would require a bond amount of $68,935 plus <br />$313,000, (ref. page 2.05-20i), equals $381,935. <br />2.05-20v <br />September 1993 <br />